| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder
L1 | |
| 2 | L2₹14.1 L+₹48,808.80 (3.59%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.3 L+₹1.7 L (12.6%)Rejected-AOC BLOCK A 16 SET NO 11 SDA COLONY VIKAS NAGAR SHIMLA 9 H P | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.4 L+₹1.8 L (13.3%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹17.7 L+₹4.1 L (29.9%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹11.8 L
EMD Value
₹23,700
Closing Date
28 Jan 2021, 5:00 pmClosed
Executive Engineer, Division No.-I
Executive Engineer, Division No.-I, HPU Shimla
Re-erection of retaining wall
2021_HPU_43663_1
8-13/HPU/2020
Open Tender
Construction Works
Item Rate
120 days
HP University Summer Hill Shimla-5
Please refer to tender documents
6 documents required · 6 mandatory
₹500
Executive Engineer, Div. No.-I
₹23,700
23 Feb 2021
14 Jan 2021
29 Jan 2021
14 Jan 2021
28 Jan 2021
14 Jan 2021
Amount
Demolition of stone masonry below G.L. upto any depth including stacking of serviceable materials and disposal of un-serviceable materials upto all leads & lifts:- a) Rubble masonry in lime mortar.
Demolition of stone masonry above G.L. upto all heights including stacking of serviceable materials and disposal of un-serviceable materials upto all leads & lifts:- a) Rubble masonry in lime mortar.
Cutting in earth works in all kinds of soil including pick work, spade work, jumper work and chiselling/wedging out of hard/soft rock etc. upto all leads & lifts including through mechanical transport if required the disposal of un-serviceable materials will be done as per directions of the Engineer-in-Charge or an approved dumping site. Any damage to the roads/ existing property during the excavation/cutting will be restored by the Contractor whatsoever the nature of the same may be. The serviceable materials will be stacked to the specified dimension as per directions of the Engineer-in-Charge.
Excavation in foundation, trenches etc. in all kinds of earth work including spade work, pick work, jumper work and chiselling and doing work in saturated soil including storing, strutting and pumping or boiling on water (surface and sub-soil Water) up to any depth wedging out of rock etc. up to all leads and lifts including stacking the excavated material clear from the edge of the excavation as per direction of Engineer-in-Charge and then returning the stacked soil in 15 cm. layers when required into plinths and sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth including stacking of serviceable materials upto all leads and lifts as directed by the Engineer-in-Charge.
Providing and laying cement concrete 1:6:12 (1 cement : 6 Sand : 12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of centring and shuttering in: a) Foundation and Plinth.
Providing and Laying Cement Concrete 1:5:10 with 15% Plums and curing complete including the cost of form work for plain/reinforced concrete in retaining walls, breast walls, the size of plum should be 150 to 300 mm as per drawing and HPPWD technical specifications.
Random rubble masonry/polygonal rubble masonry (Uncoursed / brought to courses) with hard stone of approved quality in foundation, plinth and superstructure including levelling up with cement concrete 1:6:12 (1 Cement: 6 Sand: 12 Graded Stone aggregate 20 mm nominal size) in Cement Mortar 1:6 (1 Cement: 6 Sand) in breast walls and retaining walls including all leads and lifts.
Providing weapholes in brick masonry/stone masonry/ plain reinforced concrete abutment wing wall, return wall with 100 mm dia PVC Pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7.
Stone filling behind retaining walls.
JASPAL THAKUR
vivek sharma
SUDHEER THAKUR
jeet singh
Naresh Kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .