| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAdmitted-Finance NO 1 4 56 Y SRI BHARATHI NAGAR OPP PARVATHI THEATER CUMBUM ROAD THENKARAI PERIYAKULAM THENI DT 625 601 | PERIYAKULAM | THENI | TAMIL NADU | 625601 | L1 | Admitted-Finance | |
| 2 | L2₹5.0 Cr+₹41.1 L (8.94%)Admitted-Finance NO 1 PALLAKINATHU STREET AVANIYAPURAM MADURAI 12 | MADURAI | MADURAI | TAMIL NADU | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Priyadharshini Construction L1 | N.MOHANRAM L2 |
|---|---|---|---|---|---|
| 1.00 | A.1Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 302 | m3 | 131 ₹39,562 | 120 ₹36,240 Lowest |
| 2.00 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | 33 | m3 | 1,400 ₹46,200 | 900 ₹29,700 Lowest |
| 3.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. | 50 | m3 | 5,000 ₹2,50,000 Lowest | 5,500 ₹2,75,000 |
| 4.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete. | 41 | m3 | 10,000 ₹4,10,000 Lowest | 10,900 ₹4,46,900 |
| 5.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 38 | m3 | 23,000 ₹8,74,000 Lowest | 25,000 ₹9,50,000 |
| 6.00 | Refilling the excavated earth | 140 | m3 | 50 ₹7,000 Lowest | 100 ₹14,000 |
| 7.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level | 43 | m3 | 13,100 ₹5,63,300 Lowest | 14,000 ₹6,02,000 |
| 8.00 | Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete. | 438 | m3 | 455 ₹1,99,290 | 390 ₹1,70,820 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete. | 11 | m3 | 13,100 ₹1,44,100 Lowest | 14,000 ₹1,54,000 |
| 10.00 | Providing PCC 1:3:6 using 40mm graded hard machine broken granite stone, including cost of all materials, without form work, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC. | 64 | m3 | 5,000 ₹3,20,000 Lowest | 5,500 ₹3,52,000 |
Tender Value
Refer Docs
EMD Value
₹5.0 L
Closing Date
12 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO / Madurai
Civil and Electrical works for Gopalapuram
2026_EB_670504_1
CE/TP SO/MDU Specn.No.021/2025-26
Open Tender
Electrical Works
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5.0 L
2 Jul 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A.1Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 302 | m3 | - | - |
| 2 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | 33 | m3 | - | - |
| 3 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. | 50 | m3 | - | - |
| 4 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete. | 41 | m3 | - | - |
| 5 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 38 | m3 | - | - |
| 6 | Refilling the excavated earth | 140 | m3 | - | - |
| 7 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level | 43 | m3 | - | - |
| 8 | Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete. | 438 | m3 | - | - |
| 9 | RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete. | 11 | m3 | - | - |
| 10 | Providing PCC 1:3:6 using 40mm graded hard machine broken granite stone, including cost of all materials, without form work, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC. | 64 | m3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_805766.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .