| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 CrAccepted-AOC | ₹10.6 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹11.4 CrRejected-Finance GORAKHPUR | UTTAR PRADESH | 273001 | ₹11.4 Cr | 2 | Rejected-Finance 2 |
| 3 | 3₹12.4 CrRejected-Finance | ₹12.4 Cr | 3 | Rejected-Finance 3 |
| 4 | 4₹12.6 CrRejected-Finance | ₹12.6 Cr | 4 | Rejected-Finance 4 |
| 5 | 5₹14.1 CrRejected-Finance | ₹14.1 Cr | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/s VIJENDRA PRATAP SINGH L2 | M/S SANJEEV KUMAR YADAV L5 | M/S Paliwal Brothers L1 | AMBE INFRAPROJECTS PRIVATE LIMITED L4 | M/S Sudhir Kumar L3 | M/S ARYAN ENTERPRISES L6 | Prabha Construction Infra Private Limited L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per Morth Specification 201 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 61,600 | Sqm | 4 ₹2.5 L | 5 ₹3.1 L | 2 ₹1.2 L | 3 ₹1.8 L | 9 ₹5.5 L | 16 ₹9.9 L | 19.5 ₹12.0 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. as per Morth Specification 301 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 5,765 | Cum | 45 ₹2.6 L | 40 ₹2.3 L | 35 ₹2.0 L | 60 ₹3.5 L | 50 ₹2.9 L | 56.6 ₹3.3 L | 59 ₹3.4 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per Morth Specification 305 (3.17) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 5,765 | Cum | 45 ₹2.6 L | 45 ₹2.6 L | 40 ₹2.3 L | 60 ₹3.5 L | 100 ₹5.8 L | 64 ₹3.7 L | 50 ₹2.9 L |
| 4.00 | Construction of embankment with approved materials obtained from borrow pits with all lifts and 2 km leads , transporting to site ,spreading,grading to required slope and compacting to meet requirement of table 300-2. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 24,446 | Cum | 70 ₹17.1 L | 145 ₹35.4 L | 125 ₹30.6 L | 180 ₹44.0 L | 150 ₹36.7 L | 225 ₹55.0 L | 150 ₹36.7 L |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 2 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 (3.18) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 4,752 | Cum | 80 ₹3.8 L | 175 ₹8.3 L | 125 ₹5.9 L | 180 ₹8.6 L | 190 ₹9.0 L | 230 ₹10.9 L | 200 ₹9.5 L |
| 6.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 316 | Cum | 200 ₹63,200 | 610 ₹1.9 L | 300 ₹94,800 | 350 ₹1.1 L | 100 ₹31,600 | 922 ₹2.9 L | 300 ₹94,800 |
| 7.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 5,765 | Cum | 3,300 ₹1.9 Cr | 4,100 ₹2.4 Cr | 2,900 ₹1.7 Cr | 3,300 ₹1.9 Cr | 3,450 ₹2.0 Cr | 4,625 ₹2.7 Cr | 4,250 ₹2.5 Cr |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRTH Sp. 406 (4.14) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 7,656 | Cum | 3,400 ₹2.6 Cr | 4,550 ₹3.5 Cr | 3,300 ₹2.5 Cr | 3,500 ₹2.7 Cr | 3,600 ₹2.8 Cr | 5,000 ₹3.8 Cr | 5,100 ₹3.9 Cr |
| 9.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MoRTH specification clause No. 502A Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 48,400 | Sqm | 16 ₹7.7 L | 38 ₹18.4 L | 30 ₹14.5 L | 30 ₹14.5 L | 22 ₹10.6 L | 38 ₹18.4 L | 40 ₹19.4 L |
| 10.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder( VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 2,904 | Cum | 11,000 ₹3.2 Cr | 11,800 ₹3.4 Cr | 9,800 ₹2.8 Cr | 10,500 ₹3.0 Cr | 9,500 ₹2.8 Cr | 12,400 ₹3.6 Cr | 13,000 ₹3.8 Cr |
Updated dates
Tender Value
₹15.7 Cr
EMD Value
₹30 L
Closing Date
30 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Widenning and Strenthning in 1.5 Lane of Gorakhpur Deoria NH KM 110 to Belwar Via Shivpur Rampur Dadhi Jungle Kewtalia Road in District Gorakhpur in FY 2025-26 Lot No-2 of 4
2025_CEGKP_1097119_2
7651/135C-Gkp Circle/2025 dated 13-11-2025
Open Tender
Civil Works
365 days
Gorakhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹30 L
18 Mar 2026
8 Dec 2025
30 Dec 2025
8 Dec 2025
30 Dec 2025
8 Dec 2025
Amount
Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per Morth Specification 201 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. as per Morth Specification 301 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per Morth Specification 305 (3.17) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of embankment with approved materials obtained from borrow pits with all lifts and 2 km leads , transporting to site ,spreading,grading to required slope and compacting to meet requirement of table 300-2. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 2 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORTH specification no. 305 (3.18) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRTH Sp. 406 (4.14) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MoRTH specification clause No. 502A Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder( VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRTH specification clause No. 503(i) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507(B) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching as per MORTH specification clause No. 700 & 2504 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Providing and laying Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications as per MORTH specification clause No. 2504 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.As per MoRTH Clause 304 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain cement concrete M-15 in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORTH specification clause No. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Plain cement concrete M-20 in culvert complete as per Drawing and Technical Specification as per MORTH specification clause No.1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications as per MORTH specification clause No. 1600 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST).
Supply & Laying of 15mm brick ballast mixed with sand below pipe as bedding in 15cm thickness and in haunch of pipe Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.As per MoRTH Clause 1300 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. As per MoRTH Clause 1300 & 2200 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications As per MoRTH Clause 1300 & 2200 Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Supply of 900 mm dia pipe NP3 inluding cartage up to site loading unloading and all taxes etc. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Fixing of 900 mm dia pipe NP3, S&S in proper alignment Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
White/Color Washing Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
Lettering and painting of culvert no. Plate 30x30cm of standard size with two coats of approved synthetic enamel paint and lettering as per PWD maintenance manual including cost of all materials, labour T&P etc. complete. Complete in all respect as per direction of E/I. (Including Labour Cess but Excluding GST)
5 Year Maintenance Charge Complete in all respect as per GO No. 17/2024/Sa-23-1-2024-23-1099/113/2023 Dated 16.01.2024 and Circular of EnC 3689C0PRMC/Mool-23-24 Dated 17.02.2024 & direction of E/I. (Including Labourcess but Excluding GST). 1st Year Mainntenance Cost @ 0 % & 2nd Year @ 0.25%
For 3rd Year @ 0.50%
For 4th Year @ 0.75%
For 5th Year @ 1%
M/s VIJENDRA PRATAP SINGH (BID ID -5778693)
M/S Sudhir Kumar (BID ID -5780091)
AMBE INFRAPROJECTS PRIVATE LIMITED (BID ID -5779236)
M/S SANJEEV KUMAR YADAV (BID ID -5765745)
M/S ARYAN ENTERPRISES (BID ID -5778772)
Prabha Construction Infra Private Limited (BID ID -5778499)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.63 MB
Tendernotice_2.pdf
PDF • 0.81 MB
Tendernotice_3.pdf
PDF • 0.49 MB
Tendernotice_4.pdf
PDF • 0.06 MB
BOQ_2019915.xls
BOQ • 0.25 MB
Addendum_SBD_Lot_2.pdf
Tender Documents • 0.46 MB
Download all tender documents and submit your bid