Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
| 2 | Admitted-Finance NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | Admitted-Finance |
Tender Value
₹27.6 L
EMD Value
₹28,000
Closing Date
1 Sept 2022, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Improvements, Desilting, Strengthening the bund 2 nos in Package No.TN 30-24 in Andimadam Block of Ariyalur District Under AGAMT II 2021-22
2022_RDTN_247599_1
R.C.No.A4/5304/2021, Date.10.08.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Andimadam
As per tender document
4 documents required · 4 mandatory
₹0
₹28,000
14 Sept 2022
18 Aug 2022
1 Sept 2022
18 Aug 2022
1 Sept 2022
18 Aug 2022
Amount
1.Improvements, Desilting, Strengthening the bund to Thirukonam Eri at Silambur Pt Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Channel
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cost and Supply of Weep Holes 90mm PVC Pipe
Provision for Name board
2.Improvements, Desilting, Strengthening the bund to kolapadi Venjayathu Eri at Vilandhai Pt Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Channel
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications
Cost and Supply of Weep Holes 90mm PVC Pipe
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Panneerselvam
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .