| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC 178 A HIGHWAY PLAZA SEC 124 SUNNY ENCLAVE MOHALI PUNJAB 140301 | S A S NAGAR | PUNJAB | 140301 | L1 | Accepted-AOC Work Completed | |
| 2 | L2₹32.9 L+₹1.7 L (5.44%)Rejected-Finance VILLAGE DUBOR P O TIMBI TEHSIL SHILLAI DISTRICT SIRMOUR H P | TIMBI | SIRMOUR | HIMACHAL PRADESH | 173027 | L2 | Rejected-Finance Work awarded to lowest contractor | |
| 3 | L3₹33.9 L+₹2.8 L (8.87%)Rejected-Finance HIMACHAL PRADESH HP | L3 | Rejected-Finance Work awarded to lowest contractor |
Tender Value
₹44.5 L
EMD Value
₹89,100
Closing Date
15 Dec 2021, 11:00 amClosed
Executive Engineer
Executive Engineer Salooni Division HPPWD Salooni
Construction of 2 Nos hume pipe culvert alongwith wing walls, Breast wall and Retaining wall at various R.Ds) (Under BASP)
2021_PWD_54435_1
EE Salooni Letter No. 8365-8414 dated 27-11-2021
Open Tender
Civil Works
Item Rate
90 days
Salooni
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹89,100
23 Mar 2023
8 Dec 2021
15 Dec 2021
8 Dec 2021
15 Dec 2021
8 Dec 2021
Amount
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 and 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness blind age and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying Mechanically mixed and vibrated concrete for plain / reinforced concrete nominal mix 1:5:10 ( one cement is to five sand is to ten graded crushed stone aggregate 40 millimeter (forty millimeter) nominal size in or under water and curing complete for 14 (fourteen) days, in open foundations for all type of structures and the like drain etcetera including pumping or bailing out water (surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying under water complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 or as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate includes octroi,royality,Malkana,Toll tax, GST or any other taxes imposed by the Government.
Back filling with granular material behind abutments, wing walls, return walls , R/wall complete as per drawing and M.O.R.D. technical specification clause 1203 and section 1604 , as per direction of Engineer-In-Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing weep holes in brick masonry/stone masonry/plain or reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimeter) dia P.V.C. pipe (Finolex/ Vertex) with slope of I (v): 20(H) towards drainage face complete as per drawing and MORD technical specification clauses 614, 709 and 1204.3.7 including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect and as per the direction of Engineer-In-Charge.The rate is including royality, Malkana,Toll tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated plain cement concrete in foundation and plinth as per drawing and technical specification section 800, 1200 and 1600 for nominal mix 1: 4: 8 (one cement isto four sand isto eight graded crushed/broken stone aggregate 40 mm (forty millimeters) nominal size and curing complete including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths and including the cost of form work in retaining walls, breast walls etcetera as per the direction of Engineer-in-Charge and carriage of materials, within all leads and lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/ cement concrete in open foundation for all type of structure complete using plain cement concrete grade M-10 ( M ten) per cubic metre nominal mix 1:3:6 (one cement is to three sand is to six crushed stone aggregate 40mm(forty millimetre) nominal size) in or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying concrete complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200.and to the entire satisfaction and direction of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect.The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete in sub-structure for grade M15 (M-fifteen) design mix with cement contents not less than 275 kg (two hundred seventy five kilogram) per cubic metre and using graded/ crushed stone aggregate 40 mm (forty millimetre) nominal size and curing complete including cost of form work for plain concrete work in abutment as per drawings and M.O.R.D. technical specification section 800,900, 1200 as directed by the Engineer-in-Charge including hauling/carriage of materials to various location through all modes of transportation in all leads ,lifts and other incidentals. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete in sub- structure/open foundation for cement concrete 1:2:4 ( one cement isto two sand isto four graded/ crushed stone aggregate 20 mm (twenty millimetre) nominal size, and curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in abutment of culvert etcetra as per drawing and MORD technical specification section 800,900 and 1200 as directed by the Engineer-in-Charge including hauling/carriage of materials to various location through all modes of transportation in all leads ,lifts and other incidentals. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying (to level or slope) 900mm dia (Nine thousand millimeters) diameter reinforced cement concrete heavy duty non pressure pipes IS Class NP-3 for culverts in single row including fixing collar with cement mortar 1 : 2 ( One cement : two sand) but excluding the cost of excavation, protection works, back filling, bedding concrete or first class bedding and masonry work in head walls and parapets as per drawing and MORD technical specifications section 11080, including hauling of materials in all leads and lifts and other incidental. The rate including Octroi, Royality, Malkana, Toll Tax, Sale Tax, GST or other taxes imposed by the Government.
Surender Singh
Pankaj Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .