Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.8 L+₹8,400 (3.14%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.8 L+₹16,800 (6.28%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.9 L+₹22,800 (8.52%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents not ok |
| Sl No | Description | Qty | Unit | M/s. Global Enterprise L3 | XPO REFRIGERATION ENGINEERS L1 | ELEKTRO DYNAMIC L2 | Aqua & Health Care L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Annual comprehensive maintenance of water cooler cum water purifier unit with servicing of whole system,cleaning of water reserve tank,filter with replacement o all faulty spare parts like solenoid valve,post carbon,membrane etc. Filing refrigerant gas,repair compressor,booster pump and replace of filter one in a year including checking all connection for smooth running during contract period etc.(lncluding all applicable taxes and complete the same as per satisfaction and instruction of Engineer-in-charge) | 12 | nos | 23,700 ₹2,84,400 | 22,300 ₹2,67,600 Lowest | 23,000 ₹2,76,000 | 24,200 ₹2,90,400 |
Tender Value
Refer Docs
EMD Value
₹3,550
Closing Date
18 Jul 2026, 11:30 amClosed
Sri. Tapas Manna AE KESD-I, PWD
11A Mirza Galib Street Kolkata 87
Annual comprehensive maintenance along with replacement of faulty spare parts of water cooler, water purifier unit at different floors of Block A, Bolck B and Central Block at 11A, Mirza Galib Street, Kolkata 87.
2026_WBPWD_5016117_1
WBPWD/AE/eNIT01/KESD-I/2026-27
Open Tender
CIVIL WORKS
Item Rate
365 days
11A Mirza Galib Street
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,550
Yes
17 Aug 2026
1 Jul 2026
20 Jul 2026
4 Jul 2026
18 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Annual comprehensive maintenance of water cooler cum water purifier unit with servicing of whole system,cleaning of water reserve tank,filter with replacement o all faulty spare parts like solenoid valve,post carbon,membrane etc. Filing refrigerant gas,repair compressor,booster pump and replace of filter one in a year including checking all connection for smooth running during contract period etc.(lncluding all applicable taxes and complete the same as per satisfaction and instruction of Engineer-in-charge) | - | nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_5085433.xls
BOQ • 0.28 MB
2911_.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .