Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical EMD Not Submitted So Hence Rejected |
| Sl No | Description | Qty | Unit | Mathialagan S L1 |
|---|---|---|---|---|
| 1.001.) Construction of Mini Community sanitary complex at Poosaripatty Gate. H/O : Poosripatty. | ||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil | 16.79 | cum | 250 ₹4,197.5 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 4.75 | cum | 5,200 ₹24,700 Lowest |
| 4.00 | Brick work in cement mortar 1:5 (One cement and five sand) using country bricks ground moulded of size 8 3/4" x4 1/4" x2 1/4"cm. For the following including curing,etc., complete complying with standard specification
b) For super structure in Ground floor | 11.67 | cum | 5,000 ₹58,350 Lowest |
| 5.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs etc | 7.23 | cum | 7,500 ₹54,225 Lowest |
| 6.00Supplying and erecting shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footings, column, pedestals, plinth beam, grade beams, raft slabs, staircase steps, bed blocks, critical pier etc. | ||||
| 7.00 | Below ground level | 18.82 | Sqm | 500 ₹9,410 Lowest |
| 8.00 | Above ground level | 41.5 | Sqm | 850 ₹35,275 Lowest |
| 9.00 | Supplying, fabricating and placing in position milds steel/Ribbed for steel rods all RCC works including cost of steel and binding wire also in all floors , complete complying with standard specifications etc complete | 0.45 | MT | 75,000 ₹33,750 Lowest |
| 10.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick etc | 6.08 | cum | 300 ₹1,824 Lowest |
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
9 Sept 2026, 3:00 pmClosed
BDO (VP)
BDO Office Kadayampatty
Construction of Mini Community sanitary complex at Poosaripatty Gate H/O Poosripatty Panchayat at Kadayamaptty Block in Salem District SBM(G) - 2026-27 Work No 5
2026_RDTN_697529_1
Roc.No.1406/2026/T5
Open Tender
Civil Works - Buildings
Item Wise
180 days
BDO Office Kadayampatty
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
6 Oct 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
9 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.) Construction of Mini Community sanitary complex at Poosaripatty Gate. H/O : Poosripatty. | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil | 16.79 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 4.75 | cum | - | - |
| 4 | Brick work in cement mortar 1:5 (One cement and five sand) using country bricks ground moulded of size 8 3/4" x4 1/4" x2 1/4"cm. For the following including curing,etc., complete complying with standard specification
b) For super structure in Ground floor | 11.67 | cum | - | - |
| 5 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs etc | 7.23 | cum | - | - |
| 6 | Supplying and erecting shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footings, column, pedestals, plinth beam, grade beams, raft slabs, staircase steps, bed blocks, critical pier etc. | - | - | - | - |
| 7 | Below ground level | 18.82 | Sqm | - | - |
| 8 | Above ground level | 41.5 | Sqm | - | - |
| 9 | Supplying, fabricating and placing in position milds steel/Ribbed for steel rods all RCC works including cost of steel and binding wire also in all floors , complete complying with standard specifications etc complete | 0.45 | MT | - | - |
| 10 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick etc | 6.08 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Poosaripatty.pdf
Tender Documents • 0.47 MB
BOQ_838564.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .