Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC LOWER BAZAAR RAJGARH DISTT SIRMOUR HP 173101 | SIRMAUR | HIMACHAL PRADESH | 173101 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.5 L+₹1,156.40 (0.14%)Rejected-AOC WARD NO 6 NEAR POLICE STATION RAJGARH DISTT SIRMAUR H P | SIRMAUR | HIMACHAL PRADESH | 171226 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹8.6 L+₹17,759 (2.10%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹8.3 L
EMD Value
₹8,260
Closing Date
14 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Generation Circle HPSEBL Bhabanagar
Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and PI results, and alignment and commissionin
2023_HPSEB_82430_1
HPSEBL/SEGB/DB-7/2023-24-17
Limited
Electrical Works
Percentage
60 days
Chaba
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹8,260
5 Feb 2024
7 Dec 2023
15 Dec 2023
7 Dec 2023
14 Dec 2023
7 Dec 2023
eProcurement System Government of Himachal Pradesh Created By: Ranjeet Bhatia Created Date/Time: 15-Dec-2023 04:02 PM Tender Title: Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and PI results, and alignment and commissionin Tender ID: 2023_HPSEB_82430_1
Tender Inviting Authority: Superintending Engineer Generation Circle HPSEBL, Bhabanagar
Name of Work: "Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and PI results, and alignment and commissioning of Unit No. VI of Chaba HEP.
Contract No: HPSEBL/SEGB/DB-7/2023-24-17
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Dhir Enterprises(GSTN-NA) 700000.00 2.49 846567.40 Eight Lakh Fourty Six Thousand Five Hundred and Sixty Seven
2.00 Ashutosh Kalia Contractor(GSTN-NA) 700000.00 4.50 863170.00 Eight Lakh Sixty Three Thousand One Hundred and Seventy
3.00 Anoml Traders(GSTN-NA) 700000.00 2.35 845411.00 Eight Lakh Fourty Five Thousand Four Hundred and Eleven
Lowest Amount Quoted BY: Anoml Traders(845411.00)
BOQ Summary Details Tender Title: Complete Overhauling of Synchronous Hydro Generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining IR and PI results, and alignment and commissionin Tender ID: 2023_HPSEB_82430_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Anoml Traders 845411.00 L1
2 Dhir Enterprises 846567.40 L2
3 Ashutosh Kalia Contractor 863170.00 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .