| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.5 L+₹16,406.40 (1.96%)Rejected-AOC | ₹8.5 L+₹16,406.40 (1.96%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L1 | SRI ABIRAMI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling PCC work Including all cost of materials and labour charges etc completed. | 37 | m3 | 486 ₹17,980.29 Lowest | 500 ₹18,498.24 |
| 2.00 | Earth work excavation in all kinds of soil including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 68 | m3 | 203 ₹13,803.16 Lowest | 215 ₹14,619.11 |
| 3.00 | Removing the demaged stoneware pipe including cost of labour for removing and convey the demaged pipe away from the site manually with initial lead and lift etc completed. | 146 | m | 419 ₹61,174 Lowest | 500 ₹73,000 |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 34 | m3 | 5,338 ₹1,81,471.98 Lowest | 5,338 ₹1,81,471.98 Lowest |
| 5.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as Vertical walls etc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 42 | m2 | 1,269 ₹53,294.83 Lowest | 1,275 ₹53,546.81 |
| 6.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All PCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 5.5 | m3 | 6,037 ₹33,192.03 Lowest | 6,037 ₹33,192.03 Lowest |
| 7.00 | Plastering in Cement Mortar 1:5 mix 12mm thick including all cost etc completed. | 46 | m2 | 290 ₹13,340 Lowest | 295 ₹13,570 |
| 8.00 | Lead for Conveyance of materials by Head Load of Above 10m and upto 100m of Rough Stone,Broken Stone Jelly, Cut Stone, RCC Slab, Sand-Cement Block, Wooden Scantling, Wooden Plank etc complete. | 141.5 | m3 | 120 ₹16,980 Lowest | 125 ₹17,687.5 |
| 9.00Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting,removal of slushy soil and replacing the pipeline with sound pipe,including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. | |||||
| 9.01 | 110mm Dia PVC Pipe (6KSC) | 37 | m | 659 ₹24,383 Lowest | 700 ₹25,900 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
23 Oct 2025, 3:00 pmClosed
Assistant Commissioner West Zone
West Zone, Coimbatore Corporation
Replacement of UGD Line and Restoration of CC Flooring at Kamarajar lane and Roja Poo Lane in Ward no 72 of West Zone
2025_MAWS_611814_27
E5/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
9 Apr 2026
8 Oct 2025
23 Oct 2025
9 Oct 2025
23 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_731892.pdf
finsummary_731892.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_731892.xls
BOQ • 0.26 MB
SWD.pdf
Tender Documents • 0.67 MB
E5Extension.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .