Tender Value
₹7.9 Cr
EMD Value
₹15.8 L
Closing Date
30 Oct 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DC ENGR SHQ HGI ITBP
OFFICE OF THE DIG SHQ HGI
SOs Living accommodation with guest room dining hall cum kitchen ORs accommodation including Kitchen and dining hall WT station Office and store, MI Room MT shed Recreation hall stable training shed tradesman shop and toilet block for ORs at Huri
2026_ITBP_929616_1
NO-1052-59 DTD-06/10/26
Open Tender
Civil Works - Bridges
Percentage
730 days
HURI BOP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15.8 L
2 Nov 2026
9 Oct 2026
2 Nov 2026
9 Oct 2026
30 Oct 2026
9 Oct 2026
9 Oct 2026 - 29 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | By Mechanical Transport including loading,unloading and stacking Earth Lead - 5 Km | 16,376.43 | cum | 203.36 | ₹33,30,310.8 |
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 20,163.92 | cum | 192.65 | ₹38,84,579.19 |
| 3.01 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 250 | metre | 331.31 | ₹82,827.5 |
| 4.01 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 632.8 | cum | 145.27 | ₹91,926.86 |
| 5.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.36 | cum | 20,073.18 | ₹2,28,031.32 |
| 6.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 190.16 | cum | 15,530.1 | ₹29,53,203.82 |
| 7.01 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 290.26 | sqm | 1,598.15 | ₹4,63,879.02 |
| 8.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 432.78 | cum | 20,613.54 | ₹89,21,127.84 |
| 9.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 73.88 | cum | 22,001.52 | ₹16,25,472.3 |
| 10.01 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 288.69 | cum | 22,446.53 | ₹64,80,088.75 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_976891.xls
BOQ • 0.37 MB
TENDERREDEVELOPMENT.pdf
Tender Documents • 2.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .