Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹33.1 L+₹1.2 L (3.65%)Rejected-Finance ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹36.5 L+₹4.6 L (14.3%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹47.2 L+₹15.2 L (47.7%)Rejected-Finance | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹48.3 L+₹16.4 L (51.2%)Rejected-Finance FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Jul 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS TO KITCHEN BATHROOM FLOORING TILING PLUMBING SANITARY FITTINGS DOOR AND WINDOW AND CONNECTED ITEMS AT OLD RS COLABA UNDER AGE B R II (NW) NAVY NAGAR COLABA MUMBAI
2022_MES_529745_1
8283/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.4 L
Yes
16 Sept 2022
9 Jun 2022
29 Jul 2022
9 Jun 2022
27 Jul 2022
2 Jul 2022
9 Jun 2022 - 30 Jun 2022
Amount
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles and rubbish off the premises etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 15mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour non-skid coloured Ceramic tiles 7mm thick (square/ rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in cement mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for rendering 10mm thick in cement mortar 1:4 on backing coat of wall tiles etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down chowkats with shutter (without taking off shutter from the frame) not exc 1.5 sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing anodised aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screws and locking arrangement etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing aluminium alloy wire mesh 0.45 mm nominal dia of wire and average width of aperture 1.4 mm fixed with aluminium wire staples alu shutters complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4 mm thick figured glass pin headed type and glazing with aluminium and neoprene beads in square not exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4mm thick plain sheet glass ordinary quality and glazing with aluminium and neoprene beads in square n. exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour aluminium anodised grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-104 (10mm dia and aparture 75mm) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing factory made solid panel PVC door shutter 30 mm thick (style) consisting of frame made out of M.S. frame shall be covered with heat moulded plain colour PVC 'C' channel having a PVC sheet strip of 2omm width stuck inside with solvent cement for stiles and plain colour PVC sheets for top rail, lock rail & bottom rail on either side & as gap insert for top rail & bottom rail on either side & as gap insert for top rail & bottom rail; panelling of fplain colour PVC sheet to be fitted in the M.S. frame welded/sealed to the stiles. & rails with suitable PVC sheet beading, and joined together with sovent cement, suppling & fixing in the frame at site complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing solid PVC door frame of size 50mm x 47mm made out of 5mm plain colour PVC sheet reinforced with M.S. Square tube, suppling & fixing in opening complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 75 mm size stainless steel butt hinges (ISI Marked) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing extruded aluminium alloy handles 150mm size, fabricated type, anodised complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Aluminium, anodised, barrel tower bolts 150mm size of extruded section and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing for machine cut kota stone slab single piece length as in jambs/cills of windows 18-20mm thick laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and mirror polishing (Note : kota stone single piece of Cill will be fixed in two steps) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Rounding to edges of stone slabs one edge,such as in steps,cooking plateform,and other similar situations, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs for vitreous china squatting pan Orissa pattern of size 580 x 440 mm white with back inlet and integral footrest and anti syphonnage pipe including 'P' or 'S' trap and provn of lime concrete complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair Vitreous China Ware Wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair 32mm dia waste coupling of PTMT (half or full threaded) minimum weight 32mm- 45gms, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing pillar tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing PVC connection 15mm size with PTMT nuts of length 450mm complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Unplasticised PVC pipes of pressure rating 10 kgf/cm2 of 50 mm bore fixed complete to walls, ceiling or in floors including bend and sockets etc; any type of pipe complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair PVC valveless, syphonic action type, flushing cristern, 10 ltr capacity low level, white, with inlet, ball valve, float and handle including brackets, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Flush pipe of polyethylene of low or high density for low level cistern, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for CI Nahani trap dia of outlet 75mm fixed in repairs including jointing to waste pipe in runlead fixed in cement concrete type B 1 (1:2:4), complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing PTMT grating doom over Nahani trap and floor trap of 100mm Dia (Minimum weight 25 gms) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking up or down GI tubing and connections 15 mm bore including cleaning for refixing or removal to store complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Refixing old GI tubing and connection15 mm bore in new or old position in ( Walls, ceiling, floors etc) with old accesories complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing GI Tubing 15 mm bore medium grade with all fitting and fixed complete to wall and ceiling or laid in floors complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Bib tap 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Stop valves 15mm bore, cast copper alloy fancy type chromium plated, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down cement plaster of any description including racking out joints hacking for key scrubbing down with water in patches n.exc. 4 Sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for rendering 15mm thick in CM 1:6 on other than fair faces of bricks work or concrete finished even and smooth without using extra cement complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for 05 mm thick plastering in CM 1:3 on concrete surface on ceiling finished even and smooth complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net etc all complete as directed by Engr-in-Charge. (Note :- WPC shall be measured and paid separately) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved ISI make, complete all as specified and directed by Engineer-in-Charge.
Material and labour preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Preparing surfaces, plastered or unplastered new surfaces, priming plastered and other surfaces with alkali-resistant priming paint and applying two coats of distemper oil emulsion over a coat of wall care putty, white or tinted on walls complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
All as per item 44 above but on ceiling.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying two coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, approns etc. complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour granite (of any type) slab 18 to 20mmthick machine cut,bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete for kitchen plateform etc. complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs Aluminium wire cloth, 0.45mm nominal dia of wire and average width of aperture 1.40mm, cut to required size and fixed to doors,windows shutter, with wooden beading (any size) with aluminium wire staples and removing old beading, complete all as specified and directed by Engineer-in-Charge.
Taking down aluminium windows/ventilator & refixed in repairs with proper seal adhesive after easing, tighten & proper fixing of loose fittings i.e. Screws, handles, hinges, Tower bolt replacing damaged glass , wiremesh aluminium sections etc complete all as specified and directed by Engineer-in-Charge.( Aluminium section, wiremesh,glass shall be measured and paid seperately)
Taking down shutter of any description n exc 1 sq. m each complete all as specified and directed by Enginner-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 25 mm thick flush shutter solid core construction with block board core plywood face panels, on both sides on one face fixed with screws to timber frame work of width n.exc. 25 cm in shelves or built-in cupbords, almirahs and similar work complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing hasp and staple safety type,aluminium anodised including bolt to hinge plate and fixed with screws 125mm size complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of new or previously untreated surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying one coat of pink primer and two coat of synthetic enamel paint, complete all as specified and directed by Enginner-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removal of debries outside of MD land exc. 5 Km but n.exc. 10km, complete all as specified and directed by Engineer-in-Charge.
satguruenterprises
SATYANARAYAN CONSTRUCTION
Shetty Construction Co
BOB ENTERPRISES
RS Enterprises
SHREE JAGDISH FURNITURE CO.
M/s. MAYUR ENTERPRISES
PRABHU ASSOCIATES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .