Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.8 L+₹3,790.49 (1.02%)Rejected-AOC | ₹3.8 L+₹3,790.49 (1.02%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
11 Aug 2026, 10:00 amClosed
A.E. MAINT
G/NORTH WARD DADAR
Reparing of 2 Seated Toilet at Harguru Building Chawl, Bhagat Galli Dadar West, in Beat no.191 in G/N Ward.
2026_MCGM_1325375_1
GNWCR/59 DT.24.07.2026
Open Tender
Civil Works
Percentage
60 days
G/NORTH WARD DADAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹472
₹5,000
3 Sept 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reparing of 2 Seated Toilet | |||||
| 1.01 | Demolishing brick work in lime or cement mortar including plaster, paint,
etc. manually/ by mechanical means including stacking of serviceable
material and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge. | 4.4 | Cum | 627 | ₹2,758.8 |
| 1.02 | Removing shutters of doors and windows without frame.
delivering materials in Ward Office and carting away unserviceable
materials. | 3.42 | Sqm | 229 | ₹783.18 |
| 1.03 | Removing soil pan, urinal, wash basin and sink of any type, size, make
and brand including its bedding drainage fitting. etc. complete. | 2 | Rmt | 114 | ₹228 |
| 1.04 | Removing old Rcc Slab | 0.69 | Sqm | 2,491 | ₹1,718.79 |
| 1.05 | Excavation in soils | 3.8 | Cum | 387 | ₹1,470.6 |
| 1.06 | Excavation in Cement Concrete | 0.92 | Cum | 644 | ₹592.48 |
| 1.07 | Nominal Mix of 1:2:4 (1 cement OPC: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.92 | Cum | 7,232 | ₹6,653.44 |
| 1.08 | Providing & Laying dry stone Rubble Soling with average 230 mm size
hard stone set in regular lines, handpacked and interstices thoroughly filled
with small chips including filling in with good quality murum brought from
outside, compacting with iron rammers, watering, sand spreading 12mm
thk. layer of grit on top etc complete as directed by Engineer In Charge.
(Note: The rate includes the royalty and other taxes if any) | 1.06 | Cum | 2,434 | ₹2,580.04 |
| 1.09 | P/L 1:3:6 CC | 1.38 | Cum | 6,682 | ₹9,221.16 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_2269970.xls
BOQ • 0.33 MB
DT.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .