Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | ₹2.9 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹3.5 L+₹63,963 (22.2%)Rejected-Finance | ₹3.5 L+₹63,963 (22.2%) | 2 | Rejected-Finance L-2 |
Tender Value
₹3.9 L
EMD Value
₹7,824
Closing Date
25 Jun 2026, 5:00 pmClosed
Pankaj Kumar
Municipal Committee Ratia
RE-CONST OF RAMPAT BYPASS (TOHANA ROAD CHUNGI TO BYPASS STREET ) WARD NO 05, RATIA
2026_HRY_530532_1
2026788B1DB9 1596 4A07 A207 2122CAAE6A92273ULB
Open Tender
Civil Works
Works
180 days
Ratia
IPB STREET WBM
2 documents required · 2 mandatory
₹500
₹7,824
Yes
5 Aug 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
25 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | [17.15.3]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 3. Grading III material [Through Rate] | 45.23 | cum | 1,044 | ₹47,220.12 |
| 1.02 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 449.65 | Sqm | 7 | ₹3,147.55 |
| 1.03 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 449.65 | Sqm | 655 | ₹2,94,520.75 |
| 1.04 | [21.44.8.2]Lowering plain and reinforced concrete pipes and specials into trenches for all depths and laying out the same to correct alignment gradients levels etc., including all dressing and trimming and cutting of concrete beds and joint holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching haunches and envelope are completed. The pipes shall rest on the beds at all points throughout their lengths and to ensure this they shall be grouted in where necessary as described in item no.21.38 including carriage from the stores of the Engineer-in-charge and safe delivery thereof at site of works. This includes, loading, unloading, stacking at convenient points adjacent to the works ready for lowering as may be found most convenient in the interest of work.
(For NPI or NP2 and NP3 or NP4 pipes) 8.2. 400 mm internal diametre of sewer - NP3 or NP4 Pipe [Through Rate] | 2.2 | 10 metres of completed sewer | 847 | ₹1,863.4 |
| 1.05 | [21.95.2]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 2. 400 mm [Through Rate] | 22 | Metre | 1,438 | ₹31,636 |
| 1.06 | [3.CA001] CA001. Good earth [Rate] | 68.53 | cum | 83 | ₹5,687.99 |
| 1.07 | [7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 1.59 | cum | 4,488 | ₹7,135.92 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_609579.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .