| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹2.9 L (1.30%)Rejected-Finance | ₹2.2 Cr+₹2.9 L (1.30%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 Cr+₹9.6 L (4.36%)Rejected-Finance GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹2.3 Cr+₹9.6 L (4.36%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.3 Cr+₹9.7 L (4.42%)Rejected-Finance | ₹2.3 Cr+₹9.7 L (4.42%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.6 Cr+₹35.7 L (16.2%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.6 Cr+₹35.7 L (16.2%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | m/s satish chandra jaiswal L2 | M/S BADRI SINGH L5 | M/s VINAY KUMAR CONTRACTOR L3 | VINAY KUMAR SINGH L4 | GOMATINETRA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. | 5,693.8 | M3 | 160 ₹9,11,008 | 210 ₹11,95,698 | 180 ₹10,24,884 | 180 ₹10,24,884 | 120 ₹6,83,256 Lowest |
| 2.00 | Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge | 93.94 | M3 | 360 ₹33,818.4 | 300 ₹28,182 | 200 ₹18,788 | 400 ₹37,576 | 100 ₹9,394 Lowest |
| 3.00 | Dismantling of R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge | 8.61 | M3 | 750 ₹6,457.5 | 600 ₹5,166 | 400 ₹3,444 Lowest | 850 ₹7,318.5 | 500 ₹4,305 |
| 4.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 3,486.81 | M3 | 77 ₹2,68,484.37 | 80 ₹2,78,944.8 | 70 ₹2,44,076.7 Lowest | 80 ₹2,78,944.8 | 80 ₹2,78,944.8 |
| 5.00 | Preparation of Sub-grade for Lining excluding cost of earth work. | 9,155.5 | M2 | 13 ₹1,19,021.5 | 15 ₹1,37,332.5 | 10 ₹91,555 Lowest | 15 ₹1,37,332.5 | 16 ₹1,46,488 |
| 6.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 1,020.6 | M3 | 4,000 ₹40,82,400 | 4,500 ₹45,92,700 | 4,500 ₹45,92,700 | 3,900 ₹39,80,340 Lowest | 4,500 ₹45,92,700 |
| 7.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 1,994.14 | M3 | 4,400 ₹87,74,216 | 5,000 ₹99,70,700 | 4,650 ₹92,72,751 | 4,200 ₹83,75,388 Lowest | 4,300 ₹85,74,802 |
| 8.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 8,983.17 | M2 | 120 ₹10,77,980.4 | 120 ₹10,77,980.4 | 100 ₹8,98,317 Lowest | 140 ₹12,57,643.8 | 100 ₹8,98,317 Lowest |
| 9.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 51.41 | M3 | 5,100 ₹2,62,191 | 5,500 ₹2,82,755 | 5,600 ₹2,87,896 | 6,000 ₹3,08,460 | 5,000 ₹2,57,050 Lowest |
| 10.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 84.63 | M2 | 120 ₹10,155.6 Lowest | 120 ₹10,155.6 Lowest | 137 ₹11,594.31 | 135 ₹11,425.05 | 120 ₹10,155.6 Lowest |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
23 Mar 2026, 3:00 pmClosed
SE
OFFICE OF SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Karachhana Dy. from Km. 0.000 to Km. 9.300 and demarcation of canal land.
2026_UPIDC_1126331_1
08/SE/2025-26
Open Tender
Civil Works
Item Wise
365 days
KARCHHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.0 L
PRAYAGRAJ
25 May 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
17 Mar 2026
Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work.
Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge
Dismantling of R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Preparation of Sub-grade for Lining excluding cost of earth work.
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast Poly Plus Tar paper including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Laying R.C.C 1:1:2 (M-20 ) with cement , C. sand of F.M. more than 2.0 and crushed hard stone grit i/c cost of all material ,labour ,T&P etc. required for proper completion of work but excluding cost reinforcement .
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on Nearby Pucca works in all type of soil mixed including all lead ,lift dressing , etc.
Providing superviser for watching and warding of work as per direction of Engineer in charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
E/W in filling for making approach path & diversion including all lead & lift, cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
E/W in Dismatling approach / diversion including lead lift labour T&P etc . As per direction of Engineer -in -charge .
Dry stone boulder Pitching 200mm thick , filling joint with sand including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Stone Aggregate 20 to 40 mm laid in abutment including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work.
Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work.
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2100327.xls
BOQ • 0.33 MB
DOCTons.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .