Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 CrRejected-Finance | ₹2.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 CrRejected-Finance GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹2.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.3 CrRejected-Finance | ₹2.3 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.6 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.6 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | m/s satish chandra jaiswal L2 | M/S BADRI SINGH L5 | M/s VINAY KUMAR CONTRACTOR L3 | VINAY KUMAR SINGH L4 | GOMATINETRA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. | 5,693.8 | M3 | 160 ₹9.1 L | 210 ₹12.0 L | 180 ₹10.2 L | 180 ₹10.2 L | 120 ₹6.8 L |
| 2.00 | Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge | 93.94 | M3 | 360 ₹33,818.40 | 300 ₹28,182 | 200 ₹18,788 | 400 ₹37,576 | 100 ₹9,394 |
| 3.00 | Dismantling of R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge | 8.61 | M3 | 750 ₹6,457.50 | 600 ₹5,166 | 400 ₹3,444 | 850 ₹7,318.50 | 500 ₹4,305 |
| 4.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 3,486.81 | M3 | 77 ₹2.7 L | 80 ₹2.8 L | 70 ₹2.4 L | 80 ₹2.8 L | 80 ₹2.8 L |
| 5.00 | Preparation of Sub-grade for Lining excluding cost of earth work. | 9,155.5 | M2 | 13 ₹1.2 L | 15 ₹1.4 L | 10 ₹91,555 | 15 ₹1.4 L | 16 ₹1.5 L |
| 6.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 1,020.6 | M3 | 4,000 ₹40.8 L | 4,500 ₹45.9 L | 4,500 ₹45.9 L | 3,900 ₹39.8 L | 4,500 ₹45.9 L |
| 7.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 1,994.14 | M3 | 4,400 ₹87.7 L | 5,000 ₹99.7 L | 4,650 ₹92.7 L | 4,200 ₹83.8 L | 4,300 ₹85.7 L |
| 8.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 8,983.17 | M2 | 120 ₹10.8 L | 120 ₹10.8 L | 100 ₹9.0 L | 140 ₹12.6 L | 100 ₹9.0 L |
| 9.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 51.41 | M3 | 5,100 ₹2.6 L | 5,500 ₹2.8 L | 5,600 ₹2.9 L | 6,000 ₹3.1 L | 5,000 ₹2.6 L |
| 10.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 84.63 | M2 | 120 ₹10,155.60 | 120 ₹10,155.60 | 137 ₹11,594.31 | 135 ₹11,425.05 | 120 ₹10,155.60 |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
23 Mar 2026, 3:00 pmClosed
SE
OFFICE OF SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Karachhana Dy. from Km. 0.000 to Km. 9.300 and demarcation of canal land.
2026_UPIDC_1126331_1
08/SE/2025-26
Open Tender
Civil Works
365 days
KARCHHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.0 L
PRAYAGRAJ
25 May 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
17 Mar 2026
Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work.
Dismantling of old brick work ,stone work in lime or concrete mortar including stacking of materials as per direction of Enginner -in- charge
Dismantling of R.c.c slab or othr rich Concrete including proper disposal as per direction of engg -in- charge
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Preparation of Sub-grade for Lining excluding cost of earth work.
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast Poly Plus Tar paper including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Laying R.C.C 1:1:2 (M-20 ) with cement , C. sand of F.M. more than 2.0 and crushed hard stone grit i/c cost of all material ,labour ,T&P etc. required for proper completion of work but excluding cost reinforcement .
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on Nearby Pucca works in all type of soil mixed including all lead ,lift dressing , etc.
Providing superviser for watching and warding of work as per direction of Engineer in charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
E/W in filling for making approach path & diversion including all lead & lift, cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
E/W in Dismatling approach / diversion including lead lift labour T&P etc . As per direction of Engineer -in -charge .
Dry stone boulder Pitching 200mm thick , filling joint with sand including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Stone Aggregate 20 to 40 mm laid in abutment including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work.
Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work.
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2100327.xls
BOQ • 0.33 MB
DOCTons.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid