Tender Value
₹3.8 Cr
EMD Value
₹21.1 L
Closing Date
28 Jul 2026, 3:00 pm2d left
CEO GIDA
GIDA SECTOR 7 GIDA GORAKHPUR
Construction of CC Parking Nos 01 in sector 22 Bokta Commercial Gida Gorakhpur
2026_UGIDA_1167533_1
1750/GIDA/2026-27 DT. 23.6.2026
Open Tender
Civil Works
Percentage
365 days
GIDA GORAKHPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
₹21.1 L
O/O CEO GIDA SECTOR 7 GIDA GORAKHPUR
8 Jul 2026
8 Jul 2026
28 Jul 2026
8 Jul 2026
28 Jul 2026
8 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .
Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared. Sor No. - 259 | 4,850 | Sqm | 3 | ₹14,550 |
| 2 | Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Srno. 3.16 Specification 305. | 9,154.38 | Cum | 306 | ₹28,01,240.28 |
| 3 | Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10 | 727.5 | Cum | 4,982 | ₹36,24,405 |
| 4 | construction of dry lean cement concrete sub-base over prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, the aggregate cement ratio not to exceed 15:1, the aggregate gradation after blending to be as per Table 600-1, cement content not to be less than 150 kg/cum, the optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 MPa at 7 days, mixed in a batching plant, transported to site, laid with a paver with an electronic sensor, compacted with 8-10 tonnes of vibratory roller, finished, and cured. | 727.5 | Cum | 7,862 | ₹57,19,605 |
| 5 | RCC m-30 Grade
Providing & laying cement Concrete wearing coarse M-30 grade including reinforcement complete as per drawing and technical specification. Morth Clauses 13.05 G | 1,212.5 | Cum | 9,694 | ₹1,17,53,975 |
| 6 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. MoRTH Specification 19.6 Cluase 1600 | 761.45 | Qtl | 7,310.95 | ₹55,66,922.88 |
| 7 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.compaction as per MoRTH specification 8.13 clause No. 803 complete in all respects. | 513.6 | Sqm | 618 | ₹3,17,404.8 |
| 8 | Providing Weep holes in Brick masonary/plain/reinforced concrete abutment, wing wall return wall with 100 mm dia AC Pipe, extending through the full width of the structure with slope of 1V:20H towords drawing foce. Complete as per drawing and technical specification. MoRTH clauses 2706 & 2200.13 clause No. 803 complete in all respects. | 95 | Nos | 155 | ₹14,725 |
| 9 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251 | 456.3 | Cum | 120 | ₹54,756 |
| 10 | Cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (SOR SNO-280) | 65.35 | Cum | 5,960 | ₹3,89,486 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
Tendernotice_2.pdf
PDF • 1.76 MB
BOQ_2189632.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].