Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | ₹24.4 L Quoted ₹34.5 L | L1 | Accepted-AOC OK |
| 2 | L2₹21.5 L+₹19.2 L (55.6%)Accepted-AOC | ₹21.5 L+₹19.2 L (55.6%) Quoted ₹53.6 L | L2 | Accepted-AOC OK |
| 3 | Rejected-Technical 12 SHASTRI NAGAR DEWAS MADHYA PRADESH | DEWAS | DEWAS | MADHYA PRADESH | - | - | Rejected-Technical Technical Evaluation done by Committee as per tender document |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical Evaluation done by Committee as per tender document |
| Sl No | Description | Qty | Unit | ARIHANT DECOLITES | VIBRANT STUDIO |
|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | TRADITIONAL MURAL- SHIVA AND NANDI INCLUDING HIGH QUALITY MATERIAL AND LABOR CHARGES. MATERIAL- FRP, ACRYLIC COLOUR, WEATHERPROOF COATING (PU) THICKNESS- 1’-1’6”, SIZE- HEIGHT 13’ WIDTH- 24’, ARTWORK TOTAL AREA | 312 | SQ/FT | 6,20,880 ₹7,32,638.4 | 6,23,064 ₹6,23,064 Lowest |
| 1.02 | TRADITIONAL MURAL- LANDSCAPING DESIGNED WITH TRISHUL, SHIPRA RIVER AND KRISHNA, SUDAMA AT SANDIPANI AASHRAM INCLUDING HIGH QUALITY MATERIAL AND LABOR CHARGES. MATERIAL- FRP, ACRYLIC COLOUR, WEATHERPROOF COATING (PU) THICKNESS- 4’’-10”, SIZE- HEIGHT 13’ WIDTH 47’ | 611 | SQ/FT | 9,11,917.5 ₹10,76,062.65 | 9,13,445 ₹9,13,445 Lowest |
| 1.03 | TREE SCULPTURE IN METAL/SCRAP INCLUDING HIGH QUALITY MATERIAL AND LABOUR CHARGES. MATERIAL- METAL (MS), BASE PRIMER, ACRYLIC COLOUR, WEATHERPROOF COATING (PU),
SIZE- HEIGHT 12’
WIDTH- ACCORDING TO THE HEIGHT | 1 | Nos | 3,98,000 ₹4,69,640 | 3,98,500 ₹3,98,500 Lowest |
| 1.04 | RCC PEDESTAL FOR SCULPTURE SIZE- LENGTH- 10’ WIDTH- 8’ HEIGHT-12” MATERIAL-CLADDING WITH GRANITE
STONE (MINIMUM 18 MM, POLISHED, FIRST QUALITY) | 1 | Nos | 99,500 ₹1,17,410 | 99,500 ₹99,500 Lowest |
| 1.05 | VAHAN ANIMAL ZONE- SACRED ANIMALS THAT SERVE AS THE DIVINE VEHICLES OF GODS AND GODDESSES. EXAMPLE:
1-VISHNU: GARUDA (EAGLE/MAN-BIRD) 2-SHIVA: NANDI (BULL)
3-DURGA: LION OR TIGER
4-GANESHA: MOUSE (MUSHAK)
5-KARTIKEYA (MURUGAN): PEACOCK
6-BRAHMA/SARASWATI: SWAN (HANS) 7-LAKSHMI: OWL
8-INDRA: WHITE ELEPHANT (AIRAVATA) 9-YAMA (GOD OF DEATH): WATER BUFFALO
METAL SCRAP (FERROUS SCRAP/MECHANICAL PARTS SUCH AS GEARS, BEARINGS, SHOCK ABSORBERS, NUTS, BOLTS ETC.) WITH POWDER COATING IS 13871:2021. SIZE AS PER THE ACTUAL SIZE OF THE ANIMAL (Approx 3’-6’). INTERNAL FRAMEWORK MADE OF GI/MS PIPES TO SUPPORT THE WEIGHT AND ENSURE STABILITY. FILM THICKNESS: STANDARD 80–120 MICRONS. COATING TYPE: SUPER DURABLE POLYESTER (SDP) OR FLUOROPOLYMER POWDER FOR SUPERIOR UV RESISTANCE AND GLOSS RETENTION. INCLUDING INSTALLATION BY SECURE MOUNTING ON RCC PEDESTAL OR MS BASE PLATE WITH ANCHOR BOLTS TO PREVENT TIPPING. | 9 | Nos | 8,95,500 ₹10,56,690 | 8,10,000 ₹8,10,000 Lowest |
| 1.06 | DESIGN, FABRICATION, AND INSTALLATION OF 48 LIFE-SIZED, LIFELIKE FRP SCULPTURES OF DIVERSE INDIAN BIRDS (STATE BIRDS OF DIFFERENT STATES). UTILIZING HIGH-GRADE FIBER REINFORCED PLASTIC WITH A MINIMUM 3MM THICKNESS, EACH UNIT MUST FEATURE INTRICATE ANATOMICAL DETAILING. THE FINISH REQUIRES ACRYLIC HAND-PAINTING TO REPLICATE NATURAL PLUMAGE, SEALED WITH A UV-RESISTANT, WEATHER-PROOF PU COATING FOR LONG-TERM OUTDOOR DURABILITY. SCULPTURES MUST INCLUDE CONCEALED SS/GI MOUNTING HARDWARE FOR SECURE ATTACHMENT TO TREES. THE SCOPE COVERS THE ENTIRE PROCESS FROM SPECIES SELECTION AND PROTOTYPE APPROVAL TO FINAL SITE INSTALLATION, ENSURING A VIBRANT, EDUCATIONAL PARK ENVIRONMENT. | 1 | Nos | 4,47,750 ₹5,28,345 | 4,08,000 ₹4,08,000 Lowest |
| 1.07 | RESTORING MADHUBANI ARTWORK WITH RESIN COATING REQUIRES METICULOUS CLEANING, STABILIZATION OF NATURAL PIGMENTS, AND APPLYING A CLEAR, UV-RESISTANT EPOXY (E.G., 12H RESIN) TO ENSURE DURABILITY. | 4,940 | SQ/FT | 7,37,295 ₹8,70,008.1 Lowest | - |
| 1.08 | SURFACE RECTIFICATION: SKIM-COATING WITH WALL PUTTY AND SANDING TO ACHIEVE AN ULTRA-SMOOTH FINISH. APPLYING ONE COAT OF ALKALI-RESISTANT PRIMER AND TWO COATS OF MATTE PREMIUM ACRYLIC BASE.
ANAMORPHIC MAPPING: PROVIDING A SCALED PERSPECTIVE DRAWING. GRID-MAPPING THE 72FT WALL TO ALIGN VANISHING POINTS WITH THE MAIN ENTRANCE OR VIEWING GALLERY TO OPTIMIZE THE 3D ILLUSION.
DETAILED MURAL EXECUTION: HAND-PAINTING "SINHASAN BATTISI" USING THE TECHNIQUE OF CREATING 3D ILLUSIONS ON 2D SURFACES. MUST INCLUDE DETAILED 32 CELESTIAL PUPPETS, KING VIKRAMADITYA, AND PALACE ARCHITECTURE WITH REALISTIC SHADOW-CASTING. APPLYING TWO COATS OF A NON-REFLECTIVE, TRANSPARENT UV-PROTECTIVE VARNISH TO PROTECT THE ARTWORK FROM FADING AND DUST WITHOUT ADDING SHINE. | 792 | SQ/FT | 2,36,412 ₹2,78,966.16 Lowest | - |
| 1.09 | PROVIDING, FABRICATING, AND SUPPLYING INFORMATION BOARD MADE OF GRADE 304 STAINLESS STEEL (SS304) SHEET OF 8MM THICKNESS. ITEM INCLUDES CNC LASER CUTTING TO REQUIRED SIZE, GRINDING/CHAMFERING OF EDGES TO A SMOOTH FINISH, AND DEEP LASER ETCHING/ENGRAVING OF CONTENT (TO BE GIVEN BY THE TENDERING AUTHORITY) TO A MINIMUM DEPTH OF 0.3MM TO 0.5MM. SURFACE TO BE FINISHED IN [BRUSHED/SATIN/MIRROR] FINISH AS PER DESIGN DRAWINGS. | 80 | SQ/FT | 1,99,000 ₹2,34,820 | 1,96,000 ₹1,96,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
12 May 2026, 6:00 pmClosed
DFO UJJAIN
DIVISIONAL FOREST OFFICE UJJAIN UDYAN MARG RING ROAD UJJAIN
Beautification Components at Sanskritik Van Ujjain
2026_MPFD_504129_1
Sanskritik Van 1
Open Tender
Civil Works - Others
Item Rate
DISTRICT UJJAIN
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.4 L
UJJAIN
23 Jun 2026
30 Apr 2026
13 May 2026
30 Apr 2026
12 May 2026
1 May 2026
1 May 2026 - 6 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | TRADITIONAL MURAL- SHIVA AND NANDI INCLUDING HIGH QUALITY MATERIAL AND LABOR CHARGES. MATERIAL- FRP, ACRYLIC COLOUR, WEATHERPROOF COATING (PU) THICKNESS- 1’-1’6”, SIZE- HEIGHT 13’ WIDTH- 24’, ARTWORK TOTAL AREA | 312 | SQ/FT | 2,000 | ₹6,24,000 |
| 1.02 | TRADITIONAL MURAL- LANDSCAPING DESIGNED WITH TRISHUL, SHIPRA RIVER AND KRISHNA, SUDAMA AT SANDIPANI AASHRAM INCLUDING HIGH QUALITY MATERIAL AND LABOR CHARGES. MATERIAL- FRP, ACRYLIC COLOUR, WEATHERPROOF COATING (PU) THICKNESS- 4’’-10”, SIZE- HEIGHT 13’ WIDTH 47’ | 611 | SQ/FT | 1,500 | ₹9,16,500 |
| 1.03 | TREE SCULPTURE IN METAL/SCRAP INCLUDING HIGH QUALITY MATERIAL AND LABOUR CHARGES. MATERIAL- METAL (MS), BASE PRIMER, ACRYLIC COLOUR, WEATHERPROOF COATING (PU),
SIZE- HEIGHT 12’
WIDTH- ACCORDING TO THE HEIGHT | 1 | Nos | 4,00,000 | ₹4,00,000 |
| 1.04 | RCC PEDESTAL FOR SCULPTURE SIZE- LENGTH- 10’ WIDTH- 8’ HEIGHT-12” MATERIAL-CLADDING WITH GRANITE
STONE (MINIMUM 18 MM, POLISHED, FIRST QUALITY) | 1 | Nos | 1,00,000 | ₹1,00,000 |
| 1.05 | VAHAN ANIMAL ZONE- SACRED ANIMALS THAT SERVE AS THE DIVINE VEHICLES OF GODS AND GODDESSES. EXAMPLE:
1-VISHNU: GARUDA (EAGLE/MAN-BIRD) 2-SHIVA: NANDI (BULL)
3-DURGA: LION OR TIGER
4-GANESHA: MOUSE (MUSHAK)
5-KARTIKEYA (MURUGAN): PEACOCK
6-BRAHMA/SARASWATI: SWAN (HANS) 7-LAKSHMI: OWL
8-INDRA: WHITE ELEPHANT (AIRAVATA) 9-YAMA (GOD OF DEATH): WATER BUFFALO
METAL SCRAP (FERROUS SCRAP/MECHANICAL PARTS SUCH AS GEARS, BEARINGS, SHOCK ABSORBERS, NUTS, BOLTS ETC.) WITH POWDER COATING IS 13871:2021. SIZE AS PER THE ACTUAL SIZE OF THE ANIMAL (Approx 3’-6’). INTERNAL FRAMEWORK MADE OF GI/MS PIPES TO SUPPORT THE WEIGHT AND ENSURE STABILITY. FILM THICKNESS: STANDARD 80–120 MICRONS. COATING TYPE: SUPER DURABLE POLYESTER (SDP) OR FLUOROPOLYMER POWDER FOR SUPERIOR UV RESISTANCE AND GLOSS RETENTION. INCLUDING INSTALLATION BY SECURE MOUNTING ON RCC PEDESTAL OR MS BASE PLATE WITH ANCHOR BOLTS TO PREVENT TIPPING. | 9 | Nos | 1,00,000 | ₹9,00,000 |
| 1.06 | DESIGN, FABRICATION, AND INSTALLATION OF 48 LIFE-SIZED, LIFELIKE FRP SCULPTURES OF DIVERSE INDIAN BIRDS (STATE BIRDS OF DIFFERENT STATES). UTILIZING HIGH-GRADE FIBER REINFORCED PLASTIC WITH A MINIMUM 3MM THICKNESS, EACH UNIT MUST FEATURE INTRICATE ANATOMICAL DETAILING. THE FINISH REQUIRES ACRYLIC HAND-PAINTING TO REPLICATE NATURAL PLUMAGE, SEALED WITH A UV-RESISTANT, WEATHER-PROOF PU COATING FOR LONG-TERM OUTDOOR DURABILITY. SCULPTURES MUST INCLUDE CONCEALED SS/GI MOUNTING HARDWARE FOR SECURE ATTACHMENT TO TREES. THE SCOPE COVERS THE ENTIRE PROCESS FROM SPECIES SELECTION AND PROTOTYPE APPROVAL TO FINAL SITE INSTALLATION, ENSURING A VIBRANT, EDUCATIONAL PARK ENVIRONMENT. | 1 | Nos | 4,50,000 | ₹4,50,000 |
| 1.07 | RESTORING MADHUBANI ARTWORK WITH RESIN COATING REQUIRES METICULOUS CLEANING, STABILIZATION OF NATURAL PIGMENTS, AND APPLYING A CLEAR, UV-RESISTANT EPOXY (E.G., 12H RESIN) TO ENSURE DURABILITY. | 4,940 | SQ/FT | 1,500 | ₹74,10,000 |
| 1.08 | SURFACE RECTIFICATION: SKIM-COATING WITH WALL PUTTY AND SANDING TO ACHIEVE AN ULTRA-SMOOTH FINISH. APPLYING ONE COAT OF ALKALI-RESISTANT PRIMER AND TWO COATS OF MATTE PREMIUM ACRYLIC BASE.
ANAMORPHIC MAPPING: PROVIDING A SCALED PERSPECTIVE DRAWING. GRID-MAPPING THE 72FT WALL TO ALIGN VANISHING POINTS WITH THE MAIN ENTRANCE OR VIEWING GALLERY TO OPTIMIZE THE 3D ILLUSION.
DETAILED MURAL EXECUTION: HAND-PAINTING "SINHASAN BATTISI" USING THE TECHNIQUE OF CREATING 3D ILLUSIONS ON 2D SURFACES. MUST INCLUDE DETAILED 32 CELESTIAL PUPPETS, KING VIKRAMADITYA, AND PALACE ARCHITECTURE WITH REALISTIC SHADOW-CASTING. APPLYING TWO COATS OF A NON-REFLECTIVE, TRANSPARENT UV-PROTECTIVE VARNISH TO PROTECT THE ARTWORK FROM FADING AND DUST WITHOUT ADDING SHINE. | 792 | SQ/FT | 300 | ₹2,37,600 |
| 1.09 | PROVIDING, FABRICATING, AND SUPPLYING INFORMATION BOARD MADE OF GRADE 304 STAINLESS STEEL (SS304) SHEET OF 8MM THICKNESS. ITEM INCLUDES CNC LASER CUTTING TO REQUIRED SIZE, GRINDING/CHAMFERING OF EDGES TO A SMOOTH FINISH, AND DEEP LASER ETCHING/ENGRAVING OF CONTENT (TO BE GIVEN BY THE TENDERING AUTHORITY) TO A MINIMUM DEPTH OF 0.3MM TO 0.5MM. SURFACE TO BE FINISHED IN [BRUSHED/SATIN/MIRROR] FINISH AS PER DESIGN DRAWINGS. | 80 | SQ/FT | 2,500 | ₹2,00,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TENDAR.pdf
Tender Documents • 2.61 MB
BOQ_607211.xls
BOQ • 0.34 MB
date.pdf
PDF • 0.14 MB
CORRIGENDUM.pdf
PDF • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .