Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹10.6 L+₹10,351.71 (0.99%)Rejected-AOC | L2 | Rejected-AOC 2ND LOWEST | |
| 3 | L3₹11.0 L+₹51,765.15 (4.93%)Rejected-AOC | L3 | Rejected-AOC 3RD LOWEST |
Tender Value
₹11.8 L
EMD Value
₹1.2 L
Closing Date
26 Sept 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
EE ID BIJNOR
LINING OF DHABI MINOR FROM KM 2.210 TO KM 2.300
2022_UPIDC_726099_1
02/EE/2022-23
Open Tender
Civil Works
Item Rate
90 days
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.2 L
2 Dec 2022
6 Sept 2022
27 Sept 2022
6 Sept 2022
26 Sept 2022
6 Sept 2022
90 days
Amount
Earth work in filling in ordinary soil for strenthening of banks including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 600m lead.Earth borrowed from private land (not aquired ) labour T&P complete. .
Brick work in C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Reinforced Cement concrete (M 20 grade) 1:1.5:3 in normal mix with aggregate size 4 to 20 mm. with cost of all material, labour and T&P etc. complete.
HYSD bar as reinforcement concrete i/c bending proper completion of work per qtl
Plain Cement concrete (M 7.5 grade) 1:4:8 in normal mix with aggregate size 4 to 20 mm. with cost of all material, labour and T&P etc. complete.
Ordinary Centering & shuttering for R. C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
Ordinary Centering & shuttering for C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
Supplying/laying empty cement bag in position i/c all cost labour, t&p etc complete.
Flat Brick Pitching work in C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Cement pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete.
M/S SATYAVEER SINGH S/O LAKHAN SINGH
M/S RAVI PRATAP SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .