| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4,760Admitted-Finance MANSA | MANSA | MANSA | PUNJAB | L1 | Admitted-Finance | |
| 2 | L1₹4,760Admitted-Finance W 18 SHOP NO 226 AKALSAR ROAD NEAR GILL CHOWK MOGA PB | MOGA | MOGA | PUNJAB | L1 | Admitted-Finance | |
| 3 | L1₹4,760Admitted-Finance | L1 | Admitted-Finance | |
| 4 | L2₹4,777+₹17 (0.36%)Admitted-Finance | L2 | Admitted-Finance | |
| 5 | L3₹4,780+₹20 (0.42%)Admitted-Finance PSPCL LEHRAGAGA | SANGRUR | SANGRUR | PUNJAB | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Garg Electricals L8 | SIDHIVINAYAK POWER AND INFRASTRUCTURE L11 | dhaliwal electrical L4 | ASHOKA ENGINEERING WORKS L1 | STAR CONTRACTOR ELECTRICAL L1 | BUTA RAM AND COMPANY L9 | NATIONAL ELECTRICALS L1 | KHUDAL ELECTRICAL ENGG. L3 | DASHMESH ELECTRICAL L2 | DHILLON ELECTRICAL CONTRACTOR L7 | SINGLA ELECTRICAL STORE L7 | Laksh Engineers And Co. L6 | M.L.G AND COMPANY L10 | PARAMJIT SINGH CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Erection of 11 KV & LT lines, Installation of Distribution Transformers, HT/LT Capacitors, MCBs Meter Pillar Boxes & Allied works including erection work of Domestic , NRS, Industrial , Tube well & other connection as per approved PSPCL drawings / Design under Normal Development, SIS & Deposit Works, 24Hrs supply to Dera Dhanies, Bifurcation of feeders, deloading of transformers and other works likely to be executed during 2021-22 on labour rates as per PSPCL approved drawing design Under DS Circle Bathinda (Divn. Bathinda, Divn. Rampura, Divn Bhagta, Divn. Maur, Divn. Mansa and Divn. Budhlada) | 1 | Nos | 4,905 ₹4,905 | 5,250 ₹5,250 | 4,800 ₹4,800 | 4,760 ₹4,760 Lowest | 4,760 ₹4,760 Lowest | 4,910 ₹4,910 | 4,760 ₹4,760 Lowest | 4,780 ₹4,780 | 4,777 ₹4,777 | 4,880 ₹4,880 | 4,880 ₹4,880 | 4,815 ₹4,815 | 5,050 ₹5,050 | 4,810 ₹4,810 |
| 2.00Note: 1. Quantity of work can be increased/decreased depending upon actual site conditions. 2. All the material will be supplied by the PSPCL. 3. The work/ job should be done as per sketches supplied by Sr.Xen/Addl.SE Op. Divisions under DS Circle Bathinda and the work should be completed as per norms of the PSPCL. 4. Status of L-1 will be decided on the basis of SLR (Net Premium Rate) Quoted by firm, however fabrication rates shall be negotiated with L-1 firm. 5. In case tender process is not completed due to any reason, no corrigendum will be published in newspapers. Details regarding corrigendum may be seen on https://eproc.punjab.gov.in | |||||||||||||||||
Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
29 Apr 2021, 9:00 amClosed
SE DS BATHINDA
D- 313, THERMAL COLONY GATE NO- 3, BATHINDA
Erection of 11 KV and LT lines, Installation of Distribution Transformers, HT LT Capacitors, MCBs Meter Pillar Boxes and Allied works including erection work of Domestic , NRS, Industrial , Tube well and other connection as per approved PSPCL drawing
2021_POWER_63282_1
SE/DS/BTI/2021-22
Open Tender
Electrical Works
Lump-sum
365 days
DS CIRCLE BATHINDA
AS PER NIT
3 documents required · 3 mandatory
₹2,360
₹7.9 L
Yes
4 May 2021
5 Apr 2021
29 Apr 2021
6 Apr 2021
29 Apr 2021
6 Apr 2021
6 Apr 2021 - 29 Apr 2021
Amount
Erection of 11 KV & LT lines, Installation of Distribution Transformers, HT/LT Capacitors, MCBs Meter Pillar Boxes & Allied works including erection work of Domestic , NRS, Industrial , Tube well & other connection as per approved PSPCL drawings / Design under Normal Development, SIS & Deposit Works, 24Hrs supply to Dera Dhanies, Bifurcation of feeders, deloading of transformers and other works likely to be executed during 2021-22 on labour rates as per PSPCL approved drawing design Under DS Circle Bathinda (Divn. Bathinda, Divn. Rampura, Divn Bhagta, Divn. Maur, Divn. Mansa and Divn. Budhlada)
Note: 1. Quantity of work can be increased/decreased depending upon actual site conditions. 2. All the material will be supplied by the PSPCL. 3. The work/ job should be done as per sketches supplied by Sr.Xen/Addl.SE Op. Divisions under DS Circle Bathinda and the work should be completed as per norms of the PSPCL. 4. Status of L-1 will be decided on the basis of SLR (Net Premium Rate) Quoted by firm, however fabrication rates shall be negotiated with L-1 firm. 5. In case tender process is not completed due to any reason, no corrigendum will be published in newspapers. Details regarding corrigendum may be seen on https://eproc.punjab.gov.in
ASHOKA ENGINEERING WORKS
NATIONAL ELECTRICALS
DASHMESH ELECTRICAL
KHUDAL ELECTRICAL ENGG.
dhaliwal electrical
PARAMJIT SINGH CONTRACTOR
Laksh Engineers And Co.
DHILLON ELECTRICAL CONTRACTOR
SINGLA ELECTRICAL STORE
Garg Electricals
BUTA RAM AND COMPANY
M.L.G AND COMPANY
SIDHIVINAYAK POWER AND INFRASTRUCTURE
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_126959.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .