Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.6 L+₹78,720 (11.5%)Admitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | ₹7.6 L+₹78,720 (11.5%) | L2 | Admitted-Finance |
| 3 | L3₹7.8 L+₹94,800 (13.9%)Admitted-Finance | ₹7.8 L+₹94,800 (13.9%) | L3 | Admitted-Finance |
| 4 | L4₹8.0 L+₹1.2 L (17.6%)Admitted-Finance | ₹8.0 L+₹1.2 L (17.6%) | L4 | Admitted-Finance |
| 5 | L5₹8.3 L+₹1.5 L (21.6%)Admitted-Finance | ₹8.3 L+₹1.5 L (21.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIR IRFAN ELECTRICAL/SUPPLIERS L2 | M/S QADRI ELECTRICALS L5 | BUDOO ELECTRICALS AND SUPPLIERS L3 | AL FALAH ELECTRICAL WORKS L1 | m/s paul engineering constructions L6 | M/S MALIK CONSTRUCTIONS AND SUPPLIERS L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00LT improvement at Sector 11 Hamdaniya Colony Bemina and LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina falling under the jurisdiction of ESD Watalkadal, ED 3rd (Turnkey Basis) | |||||||||
| 1.01 | Supply, Installation, Testing and commissiong of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
1.LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no
2.. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -4 no. | 20 | No. | 20,000 ₹4,00,000 | 12,500 ₹2,50,000 | 20,000 ₹4,00,000 | 22,000 ₹4,40,000 | 12,000 ₹2,40,000 Lowest | 12,000 ₹2,40,000 Lowest |
| 1.02 | Supply, Laying, stringing, testing and commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 mm²) XLPE (1.1kV, 3+1 C, Al)
1.LT improvement at Sector 11 Hamdaniya Colony Bemina - 480 mtrs
2.LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 120 mtrs | 600 | Mtr | 400 ₹2,40,000 | 650 ₹3,90,000 | 300 ₹1,80,000 | 200 ₹1,20,000 Lowest | 730 ₹4,38,000 | 700 ₹4,20,000 |
| 1.03 | Supply, Laying, stringing, testing and commissioning of LT 4 core 35mm² XLPE Cable from AB Cable tapping point rhrough Piercing Connector to MSDB.
1. LT improvement at Sector 11 Hamdaniya Colony Bemina - 32 mtrs
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -16 mtrs | 48 | Mtr | 200 ₹9,600 Lowest | 300 ₹14,400 | 300 ₹14,400 | 250 ₹12,000 | 550 ₹26,400 | 300 ₹14,400 |
| 1.04 | Supply, Installation, Testing and commissiong of 3 Phase Distribution Box IP 54 made from 20 SWG CRCA MS sheet by Deep Drawn Method with Powder Coating. Internal size of the box shall be 225mm x 285mm x 120mm used for connection through ABC line and for giving connections to the consumers 3phase-1 incoming 4 outgoing I/C- 1, O/G-2-4 (200 A, 0.415 kV) for RYB Phase. The DB should have Bottom entery of Cable with proper Glands/grommets-Safety Screws and Back Clamp suitable for 11/9/8 Mtr ST Pole or 9/8 mtr PCC poles with Nuts/bolts
1. LT improvement at Sector 11 Hamdaniya Colony Bemina- 16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | 900 ₹18,000 Lowest | 4,500 ₹90,000 | 4,000 ₹80,000 | 2,300 ₹46,000 | 4,500 ₹90,000 | 3,000 ₹60,000 |
| 1.05 | Supply and Fixing of Galvanized Nuts and Bolts of sizes
1. LT improvement at Sector 11 Hamdaniya Colony Bemina - 16 kgs
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 kgs | 20 | Kg | 120 ₹2,400 | 160 ₹3,200 | 100 ₹2,000 Lowest | 100 ₹2,000 Lowest | 125 ₹2,500 | 130 ₹2,600 |
| 1.06 | Supply and Fixing of Danger Plates with Clamps
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4no. | 20 | No. | 50 ₹1,000 Lowest | 100 ₹2,000 | 50 ₹1,000 Lowest | 50 ₹1,000 Lowest | 70 ₹1,400 | 50 ₹1,000 Lowest |
| 1.07 | Supply and Fixing of Anti-Climbing Device with Clamps
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | 50 ₹1,000 Lowest | 100 ₹2,000 | 50 ₹1,000 Lowest | 150 ₹3,000 | 110 ₹2,200 | 100 ₹2,000 |
| 1.08 | Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | 1,500 ₹30,000 | 500 ₹10,000 | 300 ₹6,000 | 450 ₹9,000 | 250 ₹5,000 Lowest | 800 ₹16,000 |
| 1.09 | Supply and Painting of poles with red Oxide
1.LT improvement at Sector 11 Hamdaniya Colony Bemina -16 lts
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -4 ltrs | 20 | Ltr | 100 ₹2,000 | 100 ₹2,000 | 200 ₹4,000 | 10 ₹200 Lowest | 50 ₹1,000 | 10 ₹200 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
15 Sept 2026, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Executive Engineer, ED-3rd Srinagar
LT improvement at Sector 11 Hamdaniya Colony Bemina and LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina falling under the jurisdiction of ESD Watalkadal, ED 3rd (Turnkey Basis)
2026_PDD_322357_1
ED-III /16 of 2026-27, Dated - 25/08/2026
Open Tender
Electrical Works
Turn-key
15 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical specifications, Drawings
7 documents required · 7 mandatory
₹500
Executive Engineer, ED-3rd Srinagar
₹20,000
19 Sept 2026
25 Aug 2026
16 Sept 2026
25 Aug 2026
15 Sept 2026
25 Aug 2026
25 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LT improvement at Sector 11 Hamdaniya Colony Bemina and LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina falling under the jurisdiction of ESD Watalkadal, ED 3rd (Turnkey Basis) | |||||
| 1.01 | Supply, Installation, Testing and commissiong of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
1.LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no
2.. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -4 no. | 20 | No. | - | - |
| 1.02 | Supply, Laying, stringing, testing and commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 mm²) XLPE (1.1kV, 3+1 C, Al)
1.LT improvement at Sector 11 Hamdaniya Colony Bemina - 480 mtrs
2.LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 120 mtrs | 600 | Mtr | - | - |
| 1.03 | Supply, Laying, stringing, testing and commissioning of LT 4 core 35mm² XLPE Cable from AB Cable tapping point rhrough Piercing Connector to MSDB.
1. LT improvement at Sector 11 Hamdaniya Colony Bemina - 32 mtrs
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -16 mtrs | 48 | Mtr | - | - |
| 1.04 | Supply, Installation, Testing and commissiong of 3 Phase Distribution Box IP 54 made from 20 SWG CRCA MS sheet by Deep Drawn Method with Powder Coating. Internal size of the box shall be 225mm x 285mm x 120mm used for connection through ABC line and for giving connections to the consumers 3phase-1 incoming 4 outgoing I/C- 1, O/G-2-4 (200 A, 0.415 kV) for RYB Phase. The DB should have Bottom entery of Cable with proper Glands/grommets-Safety Screws and Back Clamp suitable for 11/9/8 Mtr ST Pole or 9/8 mtr PCC poles with Nuts/bolts
1. LT improvement at Sector 11 Hamdaniya Colony Bemina- 16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | - | - |
| 1.05 | Supply and Fixing of Galvanized Nuts and Bolts of sizes
1. LT improvement at Sector 11 Hamdaniya Colony Bemina - 16 kgs
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 kgs | 20 | Kg | - | - |
| 1.06 | Supply and Fixing of Danger Plates with Clamps
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4no. | 20 | No. | - | - |
| 1.07 | Supply and Fixing of Anti-Climbing Device with Clamps
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | - | - |
| 1.08 | Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm
1. LT improvement at Sector 11 Hamdaniya Colony Bemina -16 no.
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina - 4 no. | 20 | No. | - | - |
| 1.09 | Supply and Painting of poles with red Oxide
1.LT improvement at Sector 11 Hamdaniya Colony Bemina -16 lts
2. LT improvement at Sector 1 Hajiabad Hamdaniya Colony Bemina -4 ltrs | 20 | Ltr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
BOQ_1080113.xls
BOQ • 0.26 MB
SBD16.pdf
Tender Documents • 1.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .