Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.1 L+₹1,270.26 (0.07%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹18.1 L
EMD Value
₹36,300
Closing Date
14 Sept 2026, 12:30 pmClosed
EE RED LALITPUR
EE RED LALITPUR
Construction of child-friendly toilets at Anganwadi centers in the Madawara Development Block of Lalitpur district.
2026_REDUP_1182801_1
542/RED/NIVIDA/26-27 Dt. 01.07.2026
Open Tender
Civil Works
Percentage
180 days
MADAWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,300
29 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | site clearance with clearing of jungle uprooting of vegetables grass bush wood trees as per S.I. 259 | 100 | Sqm | 12.18 | ₹1,218 |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 41.4 | Cum | 180.05 | ₹7,454.07 |
| 3 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 16.4 | Cum | 1,469.05 | ₹24,092.42 |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 15 | Cum | 4,712.03 | ₹70,680.45 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16 | Cum | 7,507.25 | ₹1,20,116 |
| 6 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) | 40 | Cum | 5,057.37 | ₹2,02,294.8 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:1:4 (1 cement : 4 sand) | 58.6 | Cum | 6,298.8 | ₹3,69,109.68 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7 | Cum | 7,958.63 | ₹55,710.41 |
| 9 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. | 18 | qtl | 7,460.25 | ₹1,34,284.5 |
| 10 | Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge. | 540 | kg | 90.27 | ₹48,745.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.26 MB
SBD_546.pdf
Tender Documents • 0.65 MB
BOQ_2224179.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .