Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.1 L+₹1,227.20 (1.17%)Accepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L2 | SARVESWARASAMY AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-3 | 1 | Nos | 23,620 ₹23,620 | 23,000 ₹23,000 Lowest |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-3A & 3B. | 1 | Nos | 11,620 ₹11,620 Lowest | 12,000 ₹12,000 |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-3. | 1 | Nos | 22,780 ₹22,780 | 22,000 ₹22,000 Lowest |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 8,521 ₹8,521 | 8,500 ₹8,500 Lowest |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 8,521 ₹8,521 | 8,500 ₹8,500 Lowest |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-I LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 3A, 3B (Data -I) | 1 | Nos | 11,920 ₹11,920 Lowest | 12,000 ₹12,000 |
| 7.00 | CRC 500ml | 2 | Nos | 420 ₹840 | 400 ₹800 Lowest |
| 8.00 | Bolt & Nuts various sizes | 4 | Kgs | 162 ₹648 | 150 ₹600 Lowest |
| 10.00 | Dungry cloth | 10 | mtrs | 72 ₹720 | 70 ₹700 Lowest |
| 11.00 | Cotton waste | 10 | Kgs | 36 ₹360 Lowest | 40 ₹400 |
Tender Value
Refer Docs
Closing Date
9 Sept 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER/MTPS-I
MTPSI ES Circle EM-I UnitIII Dismantling and reassembling of HTLT terminal links of generator Transformer-3, UAT 3A UAT 3B for conducting statutory testing of TG GT 3 during Annual Overhaul-2026 of Unit-III
2026_EB_701239_1
CE-MTPSI-SE-ES-EMI-OT23-26-27
Open Tender
Electrical Works
Works
15 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
Yes
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-3 | 1 | Nos | - | - |
| 2 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-3A & 3B. | 1 | Nos | - | - |
| 3 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-3. | 1 | Nos | - | - |
| 4 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | - | - |
| 5 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | - | - |
| 6 | Charges for Complete cleaning washing of Generating Transformer-I LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 3A, 3B (Data -I) | 1 | Nos | - | - |
| 7 | CRC 500ml | 2 | Nos | - | - |
| 8 | Bolt & Nuts various sizes | 4 | Kgs | - | - |
| 10 | Dungry cloth | 10 | mtrs | - | - |
| 11 | Cotton waste | 10 | Kgs | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_842857.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .