Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | 1 | Accepted-AOC Below Estimate | |
| 2 | 2₹2.9 L+₹2,349.80 (0.82%)Rejected-AOC | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | M EASWARAN L2 | SRI VINAYAKA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for open cutting and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | 700 ₹700 | 688 ₹688 Lowest |
| 2.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | 1,400 ₹1,400 | 1,380 ₹1,380 Lowest |
| 3.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 15,130 ₹15,130 | 15,124 ₹15,124 Lowest |
| 4.00 | Random Rubble masonary in cm 1;5 mix using new rough and bond stones metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 5 | m2 | 42,550 ₹42,550 | 42,540 ₹42,540 Lowest |
| 5.00Centering charges for RCC work and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | |||||
| 5.01 | a) Below 1 M | 4 | m2 | 2,880 ₹2,880 | 2,860 ₹2,860 Lowest |
| 5.02 | b) For Slab | 4 | m2 | 5,880 ₹5,880 | 5,860 ₹5,860 Lowest |
| 6.00 | Brick work for superstructure in cm 1:5 mix using country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification. | 2.5 | m3 | 24,200 ₹24,200 | 24,197.5 ₹24,197.5 Lowest |
| 7.00 | Supplying and fixing of steel doors and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 25 | KG | 3,000 ₹3,000 | 2,975 ₹2,975 Lowest |
| 8.00 | Supplying and fabrication of steel placing in position and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 140 | KG | 15,400 ₹15,400 | 14,840 ₹14,840 Lowest |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
11 Sept 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of Pump room with 50mm GI pipe line at Nedimund in Hulical Town Panchayat (15th SFC 25-26 Tied 2nd Ins)
2025_DTP_602585_1
335/2025-3
Open Tender
Civil Works
Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
Yes
1 Mar 2026
10 Sept 2025
11 Sept 2025
10 Sept 2025
11 Sept 2025
10 Sept 2025
10 Sept 2025 - 11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .