Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | ₹2.9 L | 1 | Accepted-AOC Below Estimate |
| 2 | 2₹2.9 LRejected-AOC | ₹2.9 L | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | M EASWARAN L2 | SRI VINAYAKA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for open cutting and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | 700 ₹700 | 688 ₹688 |
| 2.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | 1,400 ₹1,400 | 1,380 ₹1,380 |
| 3.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 15,130 ₹15,130 | 15,124 ₹15,124 |
| 4.00 | Random Rubble masonary in cm 1;5 mix using new rough and bond stones metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 5 | m2 | 42,550 ₹42,550 | 42,540 ₹42,540 |
| 5.00Centering charges for RCC work and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | |||||
| 5.01 | a) Below 1 M | 4 | m2 | 2,880 ₹2,880 | 2,860 ₹2,860 |
| 5.02 | b) For Slab | 4 | m2 | 5,880 ₹5,880 | 5,860 ₹5,860 |
| 6.00 | Brick work for superstructure in cm 1:5 mix using country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification. | 2.5 | m3 | 24,200 ₹24,200 | 24,197.5 ₹24,197.50 |
| 7.00 | Supplying and fixing of steel doors and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 25 | KG | 3,000 ₹3,000 | 2,975 ₹2,975 |
| 8.00 | Supplying and fabrication of steel placing in position and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 140 | KG | 15,400 ₹15,400 | 14,840 ₹14,840 |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
11 Sept 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of Pump room with 50mm GI pipe line at Nedimund in Hulical Town Panchayat (15th SFC 25-26 Tied 2nd Ins)
2025_DTP_602585_1
335/2025-3
Open Tender
Civil Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
Yes
1 Mar 2026
10 Sept 2025
11 Sept 2025
10 Sept 2025
11 Sept 2025
10 Sept 2025
10 Sept 2025 - 11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid