Tender Value
₹11.2 Cr
EMD Value
₹22.5 L
Closing Date
30 Jun 2026, 2:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
General Manager (Zone-4) Agra
H No. A-121, Sec-13, Avas Vikas Colony, Sikandra, Agra
CONSTRUCTION OF MULTIPURPOSE HALL, DOORMATORY ETC. AT SAMBHOR BABA DHAM IN DISTRICT- FIROZABAD (U.P)
2026_UPPRC_1162573_1
24/GM-4/UPPCL/2026-27 Dated 16-06-2026
Open Tender
Civil Works - Buildings
365 days
Samour Baba Dham Distt Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹22.5 L
Office of General Manager (Zone-4) Agra
20 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | SANITATION BLOCK
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | CUM | - | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. | - | Cum. | - | - | - |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | CUM | - | - | - |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | CUM | - | - | - |
| 5 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | - | CUM | - | - | - |
| 6 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos E.C. 20% with 1% concentration | - | MTR | - | - | - |
| 7 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos E.C. 20% with 1% concentration | - | SQM | - | - | - |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | - | CUM | - | - | - |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of 330 kg /cum | - | CUM | - | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | - | SQM | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.38 MB
Bid_Multipurpose.pdf
Tender Documents • 4.76 MB
BOQ_2179086.xls
BOQ • 1.41 MB
Download all tender documents and submit your bid