Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹6.8 LRejected-AOC 7 KALIANNAN EXTENSION VAIKKAL ROAD GOBI 638452 | GOBI | ERODE | TAMIL NADU | 638452 | ₹6.8 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | CHANDRASEKARAN C L1 | SELVARAJ P L2 |
|---|---|---|---|---|---|
| 1.00 | Chipping of concrete and roughening the surface away from the site including all labour charges etc.,s.r p.no-30 | 240.33 | Sqm | 43 ₹10,334.19 | 46 ₹11,055.18 |
| 2.00 | Dismantling the existing damaged pressed tiles and removing away away from the site including all labour charges etc.,s.r p.no-30 | 85.5 | Sqm | 27 ₹2,308.50 | 30 ₹2,565 |
| 3.00 | Dismantling RCC by manual / by using deploying machineries away from the site including all labour charges etc.,s.r p.no-30 | 2.7 | Sqm | 4,610 ₹12,447 | 4,620 ₹12,474 |
| 4.00 | Supplying and erecting steel centering for sides and soffitscomplete
complying with standard specifications. | 3.33 | Sqm | 1,095 ₹3,646.35 | 1,100 ₹3,663 |
| 5.00 | Supplying and fabrication of steel for R.C.C.works including cost and conveyance to site and all labour charges etc., complete. | 0.05 | MT | 92,016.7 ₹4,600.84 | 92,016.7 ₹4,600.84 |
| 6.00 | Reinforced cement concrete 1:112:3 mix using 20mm ISS HBG metal
including including cost and conveyance and all labour charges | 0.16 | Cum | 9,603 ₹1,536.48 | 9,610 ₹1,537.60 |
| 7.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed 2% of weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete. Complying with standard specifications for 10sqm.50% new and 50% old | 89.37 | Sqm | 1,333.8 ₹1.2 L | 1,340 ₹1.2 L |
| 8.00 | Plastering with C.M.1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., | 18 | Sqm | 288 ₹5,184 | 290 ₹5,220 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 79.75 | Sqm | 308.8 ₹24,626.80 | 315 ₹25,121.25 |
| 10.00 | Plastering with C.M.1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc., | 29.97 | Sqm | 329 ₹9,860.13 | 343 ₹10,279.71 |
Tender Value
₹6.7 L
EMD Value
₹6,680
Closing Date
14 Jan 2026, 9:00 amClosed
The Block Development Officer (BP)
Panchayat Union, Ariyalur
Repairs of School building 1 Nos in Package No.2 at Sundakudi PUE School building (South face)
2026_RDTN_643511_1
R.C.NO.A4/3120/2025, Date.31.12.2025
Open Tender
Civil Works - Others
30 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹6,680
24 Mar 2026
13 Jan 2026
14 Jan 2026
13 Jan 2026
14 Jan 2026
13 Jan 2026
Amount
Chipping of concrete and roughening the surface away from the site including all labour charges etc.,s.r p.no-30
Dismantling the existing damaged pressed tiles and removing away away from the site including all labour charges etc.,s.r p.no-30
Dismantling RCC by manual / by using deploying machineries away from the site including all labour charges etc.,s.r p.no-30
Supplying and erecting steel centering for sides and soffitscomplete complying with standard specifications.
Supplying and fabrication of steel for R.C.C.works including cost and conveyance to site and all labour charges etc., complete.
Reinforced cement concrete 1:112:3 mix using 20mm ISS HBG metal including including cost and conveyance and all labour charges
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed 2% of weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete. Complying with standard specifications for 10sqm.50% new and 50% old
Plastering with C.M.1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc.,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
Plastering with C.M.1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc.,
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
BALA painting including cost and conveyance
Distembering two coats with cement plaster surface including cost and conveyance to site and all labours etc., complete.
Wall painting two coats with Emulsion paint including cost and conveyance to site and all labours etc., complete.
Painting two coats with approved colour ready mixed paint including cost and conveyance to site and all labourc etc,complete
Black board Painting two coats with approved colour ready mixed paint including cost and conveyance to site and all labourc etc,complete
Provision for Rain water pipes
Provision for Rain water structure
Supply and fixing of 1200 mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 300mm down rod on the existing clamp (SD 110)
Supply and fixing of single box type 4'40 W flu fitting complete with copper chokecopper leads from terminals tot he fitting with tube(SD 89) and condensor with conduit pipe suspension from the ceiling with PVC unsheathed
Provision for Cappal stand and Cubboard Arrangements
Provision for Repairing doors
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SELVARAJ P (BID ID -1563570)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
PriceBid2.pdf
Tender Documents • 0.23 MB
BOQ_771033.xls
BOQ • 0.31 MB
Technicalbid2.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid