| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance | ₹2.2 Cr | L1 | Accepted-Finance Lowest rate Quoted |
| 2 | L2₹2.3 Cr+₹2.0 L (0.88%)Rejected-Finance | ₹2.3 Cr+₹2.0 L (0.88%) | L2 | Rejected-Finance Highest rate Quoted |
| Sl No | Description | Qty | Unit | Nagarajan Construction Company Pvt Ltd L1 | M.ARUN KRISHNARAJA L2 |
|---|---|---|---|---|---|
| .10Laying and Jointing PVC Pipe. Heading | |||||
| 1.00 | Dismantling Weathering course including all incidental charges etc., complete | 2,791 | sqm | 45 ₹1,25,595 Lowest | 46 ₹1,28,386 |
| 2.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
| 2.01 | Centering for Roof Slab, Beam, Lintel etc., | 2,740 | sqm | 1,033 ₹28,30,420 Lowest | 1,035 ₹28,35,900 |
| 3.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jiggery water, etc., complete as per standard specification and as directed by the departmental officers. | 382 | Cum | 4,100 ₹15,66,200 Lowest | 4,110 ₹15,70,020 |
| 4.00 | Finishing the top of roof with one course of machine pressed tiles following size of 20cmx20cmx2cm approved quality set in Lime Mortar 1:1.5 (One Lime and one and half part Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 2,900 | Sqm | 1,340 ₹38,86,000 Lowest | 1,350 ₹39,15,000 |
| 5.00 | Finishing the top of roof with one course of machine pressed tiles following size of 20cmx20cmx2cm approved quality set in Lime Mortar 1:1.5 (One Lime and one and half part Sand) 12mm thick mixed with water proofing compound t 2% by weight of cement used etc complete with standard specification. The lime used should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry works. | 1,315 | Sqm | 1,255 ₹16,50,325 Lowest | 1,260 ₹16,56,900 |
| 6.00Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood planks for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work. | |||||
| 6.01 | Vimanam Upto 25'0" | 1,870 | Sqm | 375 ₹7,01,250 Lowest | 380 ₹7,10,600 |
| 7.00Scraping the decayed lime plaster from the surface of Vimanams Jand Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds -100sft. | |||||
Tender Value
₹2.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Nov 2025, 5:00 pmClosed
Executive Officer
Executive Officer, Arulmigu Thiyagarajaswamy Temple at Thiruvarur Town and Taluk,Thiruvarur District
Repair and Renovation of Devasiriyar Mandabam and Front RCC Mandabam in Arulmigu Thiyagarajaswamy Temple at Thiruvarur Town and Taluk,Thiruvarur District
2025_HRCE_612782_1
06-L-TVR-2025
Open Tender
Civil Works - Others
Item Wise
365 days
Arulmigu Thiyagarajaswamy Temple
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
6 Nov 2025
13 Oct 2025
6 Nov 2025
13 Oct 2025
5 Nov 2025
13 Oct 2025
13 Oct 2025 - 5 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling Weathering course including all incidental charges etc., complete
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Centering for Roof Slab, Beam, Lintel etc.,
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jiggery water, etc., complete as per standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles following size of 20cmx20cmx2cm approved quality set in Lime Mortar 1:1.5 (One Lime and one and half part Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Finishing the top of roof with one course of machine pressed tiles following size of 20cmx20cmx2cm approved quality set in Lime Mortar 1:1.5 (One Lime and one and half part Sand) 12mm thick mixed with water proofing compound t 2% by weight of cement used etc complete with standard specification. The lime used should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry works.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood planks for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work.
Vimanam Upto 25'0"
Scraping the decayed lime plaster from the surface of Vimanams Jand Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds -100sft.
Kalkaram Upto 15'0"ht
Vimanam Upto 50'0" excluding kalkaram
Brick masonry in lime mortar 1:2 (One part Lime and two parts of Sand) using Stock bricks including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram/Vimanam complete including cost and conveyance of all materials including cement, all the labor charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft. Excluding Kalkaram
Kalkaram Upto 15'0"ht
Vimanam Upto 15'0" excluding kalkaram
Providing Vargapoochu over the corewalls of Vimanams/ Gopurams, with Lime mortar 1:1.5(one part of lime and one and half part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough plastering with Lime mortar 1:1.5(one part of lime and one point five part of sand) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labor therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. For kalkaram
Kalkaram Upto 15'0"ht
Vimanam Upto 15'0" excluding kalkaram
Plastering with Lime mortar 1:1:5 (one part of lime and one and half part of sand) 12mm thick including cost and conveyance of all materials and all labor charges, curing etc., complete complying with standard specifications.
Providing water jet washing in the granite portion by using appropriate equipments with all its accessories etc., from the granite surface and making it into original surface including cost and conveyance of hire charges for all tools and plants and final clearing etc. complete
Pointing the cut stone joints with Lime Mortor 1:1.5 20 mm deep using red and yellow oxide and including cost of special tiles such brush and watering, curing etc complete, as per standard specification. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Supply & Fixing in position Weld Mesh 7.5 x 2.5cm(10 Gauge) Window including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of Zinc chromate priming coat in all floors including cost of priming coat etc., complete complying with standard specification.
Flooring with cut stone slab of size 600mm×600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour (One Lime and One and Half Sand) etc complete.
Inner flooring
Providing & fixing rain water down fall pipes of 110mm dia pvc pipes with necessary shoes bends clamps screws nails etc complete with standard specifications
Brick work in CM 1:6 (One cement and five sand) using country brick of size 83/4"x41/4"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with, standard specification.
For superstructure
Plastering with Cement mortar 1:5 (One cement and Five Plastering sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3 (One cement and Five Plastering sand, 10mm thick including cost and conveyance of all materials and labour charges, curing etc. complete complying with standard specifications.
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Vimanam of ht. Up to 15' excluding Kalkaram
Painting two coat with approved Emulsion over the cement plastered wall sufface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m2
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:1.5 (One Lime and One and Half Sand) finishing the same with LM 1:1.5 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special omaments, weapons, peedam etc., complete and providing L.M. Nayam theerval wherever necessary, inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods, binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided rate with peetam may be adopted as detailed here under)
Sudhai size above1'0" upto 2'6"
Sudhai size above2'6" upto 3'6"
Add GST 18%
M.ARUN KRISHNARAJA (BID ID -1503677)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_732220.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
specialcondition.pdf
Tender Documents • 0.11 MB
BOQ_732220.xls
BOQ • 0.28 MB
tendercondition.pdf
Tender Documents • 1.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .