Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr Quoted ₹2.9 Cr | L1 | Accepted-AOC Mutually Accepted |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
18 Feb 2020, 2:00 pmClosed
CGM(O and M)
CGM(O and M) AEGCL, Bijulee Bhawan, Paltanbazar, Ghy-01
Construction of Flood Effected Towers and associated Works (220KV and 132 KV) on pile/normal foundation in place of river eroded tower due to flash flood in the year 2019
2019_AEGCL_15504_1
AEGCL/MD/CGM (O AND M) / Flood /2019(E)
Open Tender
Electrical Works
Works
180 days
ASSAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
AEGCL
₹4.3 L
25 Sept 2020
24 Dec 2019
19 Feb 2020
24 Dec 2019
18 Feb 2020
31 Dec 2019
Amount
Tower Superstructure
Galvanised Lattice steel tower super structure,[ including hangers,gussets,strain plate (Approximate HT Steel =70%, MS=30%) A+3 & B+6
Stub Sets
Partially galvanised Stub angle with cleat (Approximate HT Steel =95%, MS=5%)
Stub setting template
Stub setting template
Nuts and bolts
Galvanised Nuts and Bolts
Power Conductor
AAA Zebra Conductor
Tension Assembly for OPGW
Suspension Assembly for OPGW
Downlead Clamp
Vibration Damper
Insulators
Porcelain Disc Insulator, 90 KN
Porcelain Disc Insulator, 120 KN
Disc Insulator Accessories
Single Suspension Hardware fittings for Zebra Conductor
Single Tension Hardware fittings for Panther Conductor
Power Conductor Accessories
Stock Bridge type Vibration Damper
Tower Accessories
Supply of Danger Plate
Supply of Phase Plate
Supply of Number Plate
Supply of Bird Guard
Supply of Anti-Climbing Device
Description of Work / Item(s)
Amount
Tower Superstructure
Galvanised Lattice steel tower super structure,[ including hangers,gussets,strain plate (Approximate HT Steel =70%, MS=30%) A+3 & B+6
Stub Sets
Partially galvanised Stub angle with cleat (Approximate HT Steel =95%, MS=5%)
Stub setting template
Stub setting template
Nuts and bolts
Galvanised Nuts and Bolts
Power Conductor
AAA Zebra Conductor
Tension Assembly for OPGW
Suspension Assembly for OPGW
Downlead Clamp
Vibration Damper
Insulators
Porcelain Disc Insulator, 90 KN
Porcelain Disc Insulator, 120 KN
Disc Insulator Accessories
Single Suspension Hardware fittings for Zebra Conductor
Single Tension Hardware fittings for Panther Conductor
Power Conductor Accessories
Stock Bridge type Vibration Damper
Tower Accessories
Supply of Danger Plate
Supply of Phase Plate
Supply of Number Plate
Supply of Bird Guard
Supply of Anti-Climbing Device
Description of Work / Item(s)
Amount
Detail & Check survey as per specification
Construction of Pile Foundation (A+3)
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Boring, providing and installation of bored cast in situ pile of 1200 mm diameter below the pile Head with M25 grade of cement concrete including the cost of reinfoprcement steel, cost of boring with temporary quide casting bentonite solution. (Length of the pile for payment shall be measured from the bottom of the pile Head). All necessary labour materials, plants and tackles etc. complete as necessary for proper executionof the job upto 21.50 meter from the bottom of the pile Head. The unit rate include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced concrete cement, supply and providing MS liner of 6 mm thick in piles upto 10 meter depth from the bottom of the ground level. All execution should be as per approved drawing. (Payment will be made as per actual length of the piles as per site condition)
Providing and laying in M25 grade concrete of specified 28 days strength for pile Pile Head, Tie Beam, Chimney including reinforcement steel, form work, scafolding for all level as per site necessary, all necessary materials and equipments, transportations, batching, mixing, vibration, dewatering etc as per approved drawing and direction.
Conducting standard penetration test (SPT) at various elevations in pile bore holes in all kind of soils including all labour, materials, tools & tackles, equipments etc. required for successful completion of the job.
Conducting Pile Intigrity test on piles using electronic control unit, hand held hammer, accelerometer, computer with required software to assess as-installed pile characteristics including mobilisation of necessary manpower, equipments, materials etc. required for successful completion of the job.
Construction of Pile Foundation (B+6)
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Boring, providing and installation of bored cast in situ pile of 1200 mm diameter below the pile Head with M25 grade of cement concrete including the cost of reinfoprcement steel, cost of boring with temporary quide casting bentonite solution. (Length of the pile for payment shall be measured from the bottom of the pile Head). All necessary labour materials, plants and tackles etc. complete as necessary for proper executionof the job upto 21.50 meter from the bottom of the pile Head. The unit rate include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced concrete cement, supply and providing MS liner of 6 mm thick in piles upto 10 meter depth from the bottom of the ground level. All execution should be as per approved drawing. (Payment will be made as per actual length of the piles as per site condition)
Providing and laying in M25 grade concrete of specified 28 days strength for pile Pile Head, Tie Beam, Chimney including reinforcement steel, form work, scafolding for all level as per site necessary, all necessary materials and equipments, transportations, batching, mixing, vibration, dewatering etc as per approved drawing and direction.
Conducting standard penetration test (SPT) at various elevations in pile bore holes in all kind of soils including all labour, materials, tools & tackles, equipments etc. required for successful completion of the job.
Conducting Pile Intigrity test on piles using electronic control unit, hand held hammer, accelerometer, computer with required software to assess as-installed pile characteristics including mobilisation of necessary manpower, equipments, materials etc. required for successful completion of the job.
Setting of stubs (Sets of four) including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling.
Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site
Stringing of power conductors including transportation from Stores and distribution of conductors and accessories to sites and laying, stringing, tensioning , clamping, jointing , jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned elsewhere per route Km (6 conductors ) of line.
Stringing of OPGW. Ground wire comploete
Grounding of towers with 3 metre long 25 mm dia G I pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt, cock etc as per Specification
Painting of towers with bituminous paints of approved quality up to 3 metres from ground level including the cost of paints.
Welding of all nuts & bolts up to the bottom cross arm level including all charges of transportation, materials etc.
Danger plates. (1 no per tower)
Erection of Phase plates.
Erection of Number plates. (1 no per tower)
Erection of Bird Guard
Erection of anti-climbing device (1 set per tower)
Description of Work / Item(s)
Amount
Opening and lowering of ground wire from the portion of the line to be dismentled and transportation to the store
Opening and lowering of the conductor from the portion of the line to be dismentled and transportation to the store.
Dismantling of tower without damaging the members, transportation to the store and proper staking
Description of Work / Item(s)
Amount
Tower Superstructure
Galvanised Lattice steel tower super structure,[ including hangers,gussets,strain plate (Approximate HT Steel =28%, MS=72%) (A+6 & A+3 )
Stub Sets
Partially galvanised Stub angle with cleat (Approximate HT Steel =95%, MS=5%)
Stub setting template
Stub setting template
Nuts and bolts
Galvanised Nuts and Bolts
Power Conductor
ACSR Panther Conductor
Groundwire
G.I. Ground Wire
Suspension Clamp
Copper Earth Bond
Insulators
Porcelain Disc Insulator, 70 KN
Disc Insulator Accessories
Single Suspension Hardware fittings for Panther Conductor
Power Conductor Accessories
Stock Bridge type Vibration Damper
Preformed Armoured Rod
Tower Accessories
Supply of Danger Plate
Supply of Phase Plate
Supply of Number Plate
Supply of Bird Guard
Supply of Anti-Climbing Device
Description of Work / Item(s)
Amount
Tower Superstructure
Galvanised Lattice steel tower super structure,[ including hangers,gussets,strain plate (Approximate HT Steel =28%, MS=72%) (A+6 & A+3 )
Stub Sets
Partially galvanised Stub angle with cleat (Approximate HT Steel =95%, MS=5%)
Stub setting template
Stub setting template
Nuts and bolts
Galvanised Nuts and Bolts
Power Conductor
ACSR Panther Conductor
Groundwire
G.I. Ground Wire
Suspension Clamp
Copper Earth Bond
Insulators
Porcelain Disc Insulator, 70 KN
Disc Insulator Accessories
Single Suspension Hardware fittings for Panther Conductor
Power Conductor Accessories
Stock Bridge type Vibration Damper
Tower Accessories
Supply of Danger Plate
Supply of Phase Plate
Supply of Number Plate
Supply of Bird Guard
Supply of Anti-Climbing Device
Description of Work / Item(s)
Amount
Detail & Check survey as per specification
Construction of Pile Foundation
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Boring, providing and installation of bored cast in situ pile of 1000 mm diameter below the pile Head with M25 grade of cement concrete including the cost of reinfoprcement steel, cost of boring with temporary quide casting bentonite solution. (Length of the pile for payment shall be measured from the bottom of the pile Head). All necessary labour materials, plants and tackles etc. complete as necessary for proper executionof the job upto 8.50 meter from the bottom of the pile Head. The unit rate include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced concrete cement, supply and providing MS liner of 6 mm thick in piles upto 10 meter depth from the bottom of the ground level. All execution should be as per approved drawing. (Payment will be made as per actual length of the piles as per site condition)
Providing and laying in M25 grade concrete of specified 28 days strength for pile Pile Head, Tie Beam, Chimney including reinforcement steel, form work, scafolding for all level as per site necessary, all necessary materials and equipments, transportations, batching, mixing, vibration, dewatering etc as per approved drawing and direction.
Conducting standard penetration test (SPT) at various elevations in pile bore holes in all kind of soils including all labour, materials, tools & tackles, equipments etc. required for successful completion of the job.
Conducting Pile Intigrity test on piles using electronic control unit, hand held hammer, accelerometer, computer with required software to assess as-installed pile characteristics including mobilisation of necessary manpower, equipments, materials etc. required for successful completion of the job.
Construction of RCC foundation including all labour, material, equipment, excavation, shuttering, head loading, back filling etc. complete for handling, transportation,batching,mixing,placing, levelling, curing etc complete inclusive of cost of cement and reinforcement steel.
(a) Concreating
(b) Reinforcement
Setting of stubs (Sets of four) including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling.
Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site
Stringing of power conductors including transportation from Stores and distribution of conductors and accessories to sites and laying, stringing, tensioning , clamping, jointing , jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned elsewhere per route Km (6 conductors ) of line.
Stringing of G.I. Ground wire including transportation and distribution of ground wire and accessories to site and laying, stringing, tensioning , clamping, jointing , complete including all fittings and accessories not specifically mentioned elsewhere per route Km of line
Grounding of towers with 3 metre long 25 mm dia G I pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt, cock etc as per Specification
Painting of towers with bituminous paints of approved quality up to 3 metres from ground level including the cost of paints.
Welding of all nuts & bolts up to the bottom cross arm level including all charges of transportation, materials etc.
Danger plates. (1 no per tower)
Erection of Phase plates.
Erection of Number plates. (1 no per tower)
Erection of Bird Guard
Erection of anti-climbing device (1 set per tower)
Description of Work / Item(s)
Amount
Opening and lowering of ground wire from the portion of the line to be dismentled and transportation to the store
Opening and lowering of the conductor from the portion of the line to be dismentled and transportation to the store .
Dismantling of tower without damaging the members, transportation to the store and proper staking
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .