| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC tender value qouted by lowest value |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance tender quoted by highest value |
| Sl No | Description | Qty | Unit | nijanthan L1 | Kottaimalai L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all classes of soil lead and lift for foundation including of all labour charges etc.complete., | 17.46 | m3 | 197 ₹3,439.62 | 200 ₹3,492 |
| 1.02 | Cement concrete -1:4;8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc | 49.24 | m3 | 5,655 ₹2.8 L | 5,660 ₹2.8 L |
| 1.03 | Supplying and erecting centering including cost and conveyance of all material to site and all labour charges etc complete. | 185.91 | m2 | 390 ₹72,504.90 | 392 ₹72,876.72 |
| 1.04 | supplying and fixing of cuddapah slab including cost and conveyance of all materials to site and all labour charges etc | 3.85 | m2 | 376 ₹1,447.60 | 380 ₹1,463 |
| 1.05 | plain CC -1:3:6using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc | 19.6 | m3 | 6,410 ₹1.3 L | 6,415 ₹1.3 L |
| 1.06 | plain CC -1:3:6using 40mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc | 2.84 | m3 | 5,929 ₹16,838.36 | 5,932 ₹16,846.88 |
| 1.07 | Supplying and fabrication of of steel including cost and conveyance of all materials to site and all labour charges etc complete. | 162.07 | kg | 91 ₹14,748.37 | 93 ₹15,072.51 |
| 1.08 | Reinforced Cement concrete -1:1.5;3using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc | 1.42 | m3 | 9,284 ₹13,183.28 | 9,286 ₹13,186.12 |
| 1.09 | Cement concrete -1:2:4using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc | 27.32 | m3 | 6,957 ₹1.9 L | 6,960 ₹1.9 L |
| 1.10 | Plastering with cement mortar 1:5 using 12mm thick over the cement concrete for floor finish including curing etc complete | 39.6 | m2 | 285 ₹11,286 | 290 ₹11,484 |
Tender Value
₹8,700
EMD Value
₹8,700
Closing Date
7 Jan 2026, 3:00 pmClosed
the block development officer,VP.
the block development office,. vp.panchayat union, chinnamanur
providing the cement cocnrete pavement with Drain from chinnavoulapuram main road to west street in C.Perumal patty of chinnavoulapuram panchayat
2025_RDTN_636927_1
providing the cement cocnrete pavement with Drain from chinnavoulapuram main road to west stree
Open Tender
Civil Works
panchayat union office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,700
Yes
30 Mar 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
Earth work excavation in all classes of soil lead and lift for foundation including of all labour charges etc.complete.,
Cement concrete -1:4;8using 40 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Supplying and erecting centering including cost and conveyance of all material to site and all labour charges etc complete.
supplying and fixing of cuddapah slab including cost and conveyance of all materials to site and all labour charges etc
plain CC -1:3:6using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
plain CC -1:3:6using 40mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Supplying and fabrication of of steel including cost and conveyance of all materials to site and all labour charges etc complete.
Reinforced Cement concrete -1:1.5;3using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Cement concrete -1:2:4using 20 mm metal (ISS HBG metal) including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 using 12mm thick over the cement concrete for floor finish including curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 0.84 MB
BOQ_762288.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid