Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹15,800 (6.32%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES L1 | C.ABDULLA ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for lifting the Gearbox from ground floor to Conveyor 45 headend (40 meter height) and shifting the Gear box near to bed and lifting the Gear box by another chain block and placed at Gear box bed. Decoupling wornout gear box from head pulley slow speed coupling, removing RMT flexible element, and brake assembly from bed. Drain oil from wornout gear box, removing gear box bed bolt, removing the cooling fan cover from input shaft, leading and lifting the gear box from the bed. Arranging supporting plates of fixture to the required position providing hydraulic jack on the fixture and tighten its bolt and nuts, heating and removing the coupling from the wornout gear box output shaft by removing hydraulic jack. Measuring and preparing output shaft, transporting of waste oil about 1 barrel available at site heating the released slow speed coupling in oil bath by fire wood to the required temperature, lifting, positioning and shrink fitting the coupling with reconditioned gear box shaft. After cooling of waste oil stored in drums and kept inside the site. Arranging supporting plates of fixture to the required position providing hydraulic jack on the fixture and tighten its bolt and nuts heating and removing the brake drum from the wornout gear box input shaft by removing hydraulic jack. Measuring and preparing input shaft, transporting of waste oil about 1 barrel available at site heating the released brake drum/new brake drum in oil bath by fire wood to the required temperature lifting, positioning and shrink fit the brake drum with the reconditioned gear box input shaft. After cooling the waste oil store in drums and keep inside the site. Arranging the chain block, leading, lifting the reconditioned gear box after assembling the slow speed coupling on output shaft and brake drum on input shaft of the reconditioned gear box and positioning the reconditioned gearbox on the bed. Checking the alignment of fluid coupling with motor, checking the alignment of fluid coupling with gear box checking the alignment with respect to drive pulley, including all the tools, cost of consumables T & P's etc., complete. | 1 | Operation | 2,50,000 ₹2,95,000 Lowest | 2,65,800 ₹3,13,644 |
Tender Value
Refer Docs
EMD Value
₹2,300
Closing Date
15 Jul 2025, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Replacement of existing worn out gear box SCN 450 by reconditioned Gear box SCN-450 in Conveyor-45
2025_EB_576021_1
CE/SE/MI/TTPS/93/2025-2026
Open Tender
Miscellaneous Works
Works
5 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,300
Yes
2 Nov 2025
30 Jun 2025
16 Jul 2025
30 Jun 2025
15 Jul 2025
30 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .