| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAdmitted-Finance | ₹7.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 Cr+₹46.5 L (6.67%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹7.4 Cr+₹46.5 L (6.67%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | H.Venkateswaran L1 | JD ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm HT Tower | 71.1 | MT | 1,25,000 ₹88,87,500 Lowest | 1,30,000 ₹92,43,000 |
| 2.00 | Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm MS Tower | 88.55 | MT | 1,15,000 ₹1,01,83,250 Lowest | 1,20,000 ₹1,06,26,000 |
| 3.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 11.04 | MT | 1,45,000 ₹16,00,800 Lowest | 1,50,000 ₹16,56,000 |
| 4.00 | Supply of ACSR Panther Conductor as per IS conforming to latest. | 27 | Kms | 2,70,000 ₹72,90,000 Lowest | 2,75,000 ₹74,25,000 |
| 5.00 | Supply of Earthwire 7/3.55mm | 2.3 | Kms | 50,000 ₹1,15,000 Lowest | 55,000 ₹1,26,500 |
| 6.00 | Supply of 120 KV Polymer Insulstor as per IS conforming to latest. | 204 | Nos. | 4,500 ₹9,18,000 Lowest | 5,500 ₹11,22,000 |
| 7.00 | Supply of 90 KV Polymer Insulstor as per IS conforming to latest. | 126 | Nos. | 4,000 ₹5,04,000 Lowest | 4,500 ₹5,67,000 |
| 8.00 | Supply of hardware fittings as per IS conforming to latest issue Single suspension fittings for Panther | 126 | Set | 2,000 ₹2,52,000 Lowest | 2,200 ₹2,77,200 |
| 9.00 | Supply of hardware fittings as per IS conforming to latest issue Single tension fittings for Panther | 180 | Set | 2,000 ₹3,60,000 Lowest | 2,500 ₹4,50,000 |
| 10.00 | Supply of hardware fittings as per IS conforming to latest issue Double tension fittings for Panther | 24 | Set | 4,000 ₹96,000 Lowest | 4,500 ₹1,08,000 |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
11 Mar 2025, 2:30 pmClosed
CE/TP-I/CNI
The Chief Engineer Transmission Projects I Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
for making LILO of both 110KV GPD SIPCOT I - SIPCOT IV feeder and 110 KV GPD - GPD SIPCOT II feeder for proposed 230KV SS at Panjetty.Reach VI - LOC 43 to LOC.53
2025_EB_528925_1
TP1-40/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
Panjetty
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.7 L
Yes
3 Apr 2025
1 Mar 2025
12 Mar 2025
1 Mar 2025
11 Mar 2025
1 Mar 2025
Amount
Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm HT Tower
Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm MS Tower
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply of ACSR Panther Conductor as per IS conforming to latest.
Supply of Earthwire 7/3.55mm
Supply of 120 KV Polymer Insulstor as per IS conforming to latest.
Supply of 90 KV Polymer Insulstor as per IS conforming to latest.
Supply of hardware fittings as per IS conforming to latest issue Single suspension fittings for Panther
Supply of hardware fittings as per IS conforming to latest issue Single tension fittings for Panther
Supply of hardware fittings as per IS conforming to latest issue Double tension fittings for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Midspan Joint for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Repair Sleeve for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Vibration dampers for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue PA rod for Panther
Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS earthwire Tension fitting
Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS earthwire Midspan compression joint
Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS Aluminium earth bond
Supply of Number plate including cost of all materials, labour, lead and lift etc., complete.
Supply of Phase plate (Set of three) including cost of all materials, labour, lead and lift etc., complete.
Supply of Danger Board including cost of all materials, labour, lead and lift etc., complete.
Supply of Name Board including cost of all materials, labour, lead and lift etc., complete.
Supply of 16 mm dia U bolts including cost of all materials, labour, lead and lift etc., complete.
Clearing juliflora jungle including cost of all labour, lead, lift, etc., complete and as directed by the Dept. Engineer at site.
Labour charges for conducting check survey, marking of pits for tower foundation as per the approved profile including chaining, cutting of light and heavy jungles as may be required and carring theodolite instrucment, measuring span length and pit marking including cost iof all men and materials as direted by Department Engineer at site.
Engaging JCB including all labour lead lift etc., complete.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Supplying and laying of 900 mm dia RCC hume pipe in water logging areas for formation of approach road including cost of materials labour lead lift transport etc complete.
Earth work excavation in hard stiff clay, stiff black cotton hard red eareth, shales, murram, grvel stoney earth, earth mixed witrh small size boulders and hard gravelly soil including bailing or pumping charges if necessary etc. complete.
Labour charges for transport of Template including assembling of template, stub and cleat and shifting of template from location to location and reassembling the same including cost of all labour, transport lead, lifts etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor).
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
Shoring and shuttering using C.W. planks and C.W. scantlings including cost of all materials labour lead lift etc. complete as directed by the engineer at site.
Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc., complete.
Labour charges for plain cement concrete 1:3:6 using 20mm HBG Stone including cost of all materials lead and lift etc complete.
R:C:C 1:1.5:3 using 12 to 20mm metal with form work including cost of all materials, curing,labour, lead, etc., complete.
Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete.
Back filling of pits with excavated earth including watering and consolidation and spread balance earth around the location ,lead and lift etc.complete.
Pipe type earthing - Providing Tower earthing using 25mm dia GI Pipe 3m long into the bore including all materials, men, lead, lift, etc., complete the tower leg as directed by dept engineer at site
Labour charges for erection of tower including cost of transporting charges,sorting out of tower parts,erection of tower,t&p etc complete
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Transporting and hoisting of Polymer /Antifog insulator strings and fitting including transport T&Ps all labour charges leads, lifts etc., complete excluding cost of suspension clamp assembly and insulators. (Under LC Condition) 90 KN - 07 Units
Transporting and hoisting of Polymer /Antifog insulator strings and fitting including transport T&Ps all labour charges leads, lifts etc., complete excluding cost of suspension clamp assembly and insulators. (Under LC Condition) 120 KN - 08 Units
Transporting and paying out of 12 nos (4 circuits) Panther conductor conductor wirth fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete Single Span
Transporting and paying out of 12 nos (4 circuits) Panther conductor conductor wirth fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete Continuous Span
Transporting and paying out of 1 no GI earth wire with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete Single Span
Transporting and paying out of 1 no GI earth wire with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete Continuous Span
Labour charges for Stringing of 12 nos (4 Circuits) ACSR Panther conductor sagging tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vlibrated dampers as directed by the Engineer (Under LC Condition) Single Span
Labour charges for Stringing of 12 nos (4 Circuits) ACSR Panther conductor sagging tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vlibrated dampers as directed by the Engineer (Under LC Condition) Continuous Span
Stringing of 1 no GI earthwire including paying out, rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete (Under LC Condition) Single Span
Stringing of 1 no GI earthwire including paying out, rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete (Under LC Condition) Continuous Span
Providing muffing and coping in P.C.C 1:2:4 using broken stone 12 to 20mm size metal including cost of formwork etc., complete
Providing plastering C:M 1 : 5, 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Arranging and attending shutdowns work on HT/LT, EHT lines, dismantling and restringing of HT/LT/EHT lines after completion of line stringing work including charges for T&Ps, transport all labour leads and lifts etc, complete ( one set means all the conductor and earth wire in the corresponding one no HT/LT/EHT line)
Painting tower legs using best qulity anti corrosive black paint two coats 1m above coping including cost of all materials labour lead lift complete in all respects.
Providing special trussels for road crossing including cost of all materials lead, lift etc complete
Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete.
Supplying and fixing display boards of size 3x2' as per the standards of road crossing location including cost of painting, letter writing, labour for transorting and fixing with all lead, lift, etc complete.
Labour charges for painting yellow base and black colour letters for feeder name and location number including cost of all materials, lead, lift, etc complete.
Labour charges for dismantling of existing tower parts on reuse condition without damaging the structural members including sorting and keeping in position as per engineer in charge at site including the cost of loading and unloading with necessary T&P lead and lift etc., complete. -AS IS WHERE IS CONDITION Tower Parts
Labour charges for dismantling of Panther conductors 6 Nos under L.C condition -AS IS WHERE IS CONDITION ACSR conductor Scrap
Labour charges for dismantling of GI Earthwire -1 No under L.C/normal condition -AS IS WHERE IS CONDITION GI Earth wire scrap
Dismantling the insulator string including cost of labour for releasing, Tools and Plants transporting charges from site etc complete (under LC condtion) for 7 units of 90 KN Disc Insulators AS IS WHERE IS CONDITION 7 units of 90 KN Disc Insulators (Dismantled)
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete (under LC condtion) for 8 units of 120 KN Disc Insulators -AS IS WHERE IS CONDITION 8 units of 120 KN Disc Insulators (Dismantled)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
JD ENTERPRISES (BID ID -1267820)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .