Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.7 L+₹18,366.77 (2.80%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.7 L+₹18,901.18 (2.88%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹13,460
Closing Date
16 Nov 2021, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Illumination arrangement of bypass road from Chemaguri bus stand Sagar to light house more, Kalibazar to Master sluice gate, Harinbari Judisthir Adarsha Vidya Sikhayatan in connection with Ganga Sagar mela 2022
2021_PHED_346302_4
WBPHE/EE/SMD/NIeT- 07 of 2021-2022
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Ganga Sagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹13,460
Yes
10 Feb 2022
11 Oct 2021
18 Nov 2021
11 Oct 2021
16 Nov 2021
11 Oct 2021
Amount
CHEMAGURI BUS STAND [SAGAR] TO LIGHT HOUSE MORE Erection of steel tubular pole of overall length 6 meter on hire basis by excavation of earth of any kind of soil 1.0/1.5 mtr. Depth below ground level with proper piling at different places with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 10.01.2022
Fitting fixing of 150 watt LED street light fixture in different place of road,on hire basis from 10.01.2022 to15.01.2022 (6 days x 167 fittings per day)
Providing of hire basis drawing of 7/20 PVC insulated single core Aluminium cable for looping and all other requiredmet meterials & dismelting after the work.
Supply & hiring basis Installation of power distrubution panel boards for power draw & supply from WBSEDCL in different substation ( 2 No Substation) including electrical inter connectionfrom departmental panel bioard to WBSEDCL panel board for LT distribution line before 06.01.2022 including proper earthing arrangement complete as per direction of EIC.
Providing of hire basis drawing 3.5 core 25 sq. mm. PVC AL. AR. Cable anddismelting the same after mela.
Making Earthing arrangement on hire basis supply 5/8'' dia earth spike of 2 mtr. Long with galvanized bolts nuts sand washer etc. including supply and fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of PCC pole.
Cutting the all rode side trees and trimming for proper illumination of road from Light house more to helipad mela ground (aprox 3km).
Constraction of 12ft x 14ft hogla shed by supplying bamboo, polythine sheet, hogla, nall etc as per direction of EIC only for personnel (not for DG set) only for gurding personals.
Guarding arrangement of the whole installation for the entire period.
KALIBAZAR TO MASTER SLUICE GATE Erection of steel tubular pole of overall length 6 meter on hire basis by excavation of earth of any kind of soil 1.0/1.5 mtr. Depth below ground level with proper piling at different places with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 10.01.2022
Fitting fixing of 150 watt LED street light fixture in different place of road,on hire basis from 10.01.2022 to15.01.2022 (6 days x 125 fittings per day)
Providing of hire basis drawing of 7/20 PVC insulated single core Aluminium cable for looping and all other requiredmet meterials & dismelting after the work.
Supply & hiring basis Installation of power distrubution panel boards for power draw & supply from WBSEDCL in different substation ( 2 No Substation) including electrical inter connectionfrom departmental panel bioard to WBSEDCL panel board for LT distribution line before 06.01.2022 including proper earthing arrangement complete as per direction of EIC.
Providing of hire basis drawing 3.5 core 25 sq. mm. PVC AL. AR. Cable anddismelting the same after mela.
Making Earthing arrangement on hire basis supply 5/8'' dia earth spike of 2 mtr. Long with galvanized bolts nuts sand washer etc. including supply and fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of PCC pole.
Cutting the all rode side trees and trimming for proper illumination of road from Light house more to helipad mela ground (aprox 3km).
Constraction of 12ft x 14ft hogla shed by supplying bamboo, polythine sheet, hogla, nall etc as per direction of EIC only for personnel (not for DG set) only for gurding personals.
Guarding arrangement of the whole installation for the entire period.
HARINBARI JUDHISTIR ADARSHA VIDYA SIKHAYATAN Supply on hire basis 4.88 mtr. Long 100 mm. dia. (AV.) bottom bamboo post and erecting the same different places
Drawing of L.T. distribution line on Salbollah/ bamboo post by PVC insulated al. wire of suitable size 10 to 16 sq. mm. from controlling station as per direction of EIC
Drawing of tube light point from nearest feeder line to different places on bamboo post as per direction of EIC with supply on hire basis 40 watt tube light complete set with interconnection complete from 08-01-2022 to 16-01-2022 = 9 days x 40 pts.
Drawing of bulb light point from nearest feeder line to different places on as per direction of EIC with supply on hire basis 100 watt bulb, holder and controlling switch complete with interconnection complete from 08-01-2022 to 16-01-2022 =9 days x 30pts.
Supply and fitting fixing of 2 PIN 5 amps plug points[for mobile charger] on hire basis from 08-01-2022 to 16-01-2022
Supply and fixing of 18/21/36 watt CFL lamp including supply of necessary materials to complete the work from 08-01-2022 to 16-01-2022 = 9 days x 10 pts.
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nail etc as per direction of the EIC only for personnel
Drawing halogen light on existing post with supplying 500 watt lamp, fixture, wire, lamp etc. as required for the work complete on hire basis from 08-01-2022 to 16-01-2022 = 9 days x 10 pts.
Guarding arrangement of the whole installation round the clock from 08-01-2022 to 16-01-2022
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
ADD GST @ 12%
ORIENTAL ENGINEERING CO.
H.K.DAS AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .