| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST₹14.5 LAccepted-AOC 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹14.5 L | FIRST | Accepted-AOC BEING FIRST LOWEST |
| 2 | SECOND₹16.3 LRejected-Finance | ₹16.3 L | SECOND | Rejected-Finance NOT BEING FIRST LOWEST |
| 3 | THIRD₹16.5 LRejected-Finance | ₹16.5 L | THIRD | Rejected-Finance NOT BEING FIRST LOWEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical BIDDER IS ENLISTED IN APPROPRIATE CATEGORY |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
6 Mar 2020, 6:00 pmClosed
GE (I) 866 EWS
GE (I) 866 EWS, C/o 99 APO
PROVISION OF ADDITIONAL COLD STORAGE ON TROLLEY MOUNTED PLATFORM WITH MOUNTED ON HOOKS QTY EA 01 AT AF STN CARNICOBAR
2020_MES_320747_1
8595E8
Open Tender
Civil Works
Item Rate
180 days
GE (I) 866 EWS, C/o 99 APO
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
Yes
GE (I) 866 EWS, C/o 99 APO
₹28,000
Yes
1 Jun 2020
6 Feb 2020
12 Mar 2020
6 Feb 2020
6 Mar 2020
21 Feb 2020
Amount
Design and supply and installation of pre fabricated room of external size 2.37 x 2.37 x 2.4 mtr with 60 mm PUF panels density of 40 Kg/Cum density for wall, ceiling and partitioned and PUF slabs with tare sheets for flooring (100 mm thick PUF insulated floor panels with 4.0 mm aluminium cheqeured plate) along with standard sized doors at supply errection, installation, testing and commissioning of air cooled refrigeration system and PUF panels with all other standard accessories suitable for room temperature should be maintained from +2⁰ C to + 9 ⁰ C and as following :-Make:Blue Star/ Voltas / Dekin / Carrier as approved by GE.
(a) Pre fabricated PUF panels for walls and ceiling with pre coated GI sheet on both side as required to construct the cold room of size 2.37 x 2.37 x 2.4 mtr (catered), (b) Insulated door PUF ( door size 34"x78" swing type with PP/PP 60 mm thick)-01 No (c) PUF slabs with tare sheet for door of cold room. (d) Flashings.
(e) Necessary Rivets.(f) Air cooled condensing unit suitable for 10,000 BTU/hrs and 12 to 14 compressor run hrs (Make Kirloskar/ Copeland/ Bluestar) (g) Refrigerant Piping in copper along with necessary fitting and walls as required including insulation for suction line . (h) First charging of refrigerant R-22/R-410A . (j) Refrigerant controls comprision of expansion valve , solenoid valve, etc. (k) Air cooling units for cold stores complete with defrosting arrangements, fan and motors etc. (l) Bulk head light with switches.
(m) Evaporator unit. (n) Copper pipes of various dia and elbows, union etc. (o) Vidoflex insulation. (p) Inter connecting wiring between condenser and eveporators (15 feets) for each machine.(q) Drain pipe PVC. (r) Digital temperature indicator.(s) PUF Chemicals (for minor gaps).(t) Silicon sealant. (u) Rubber pads.(v) Structural suppports for the complete piping in the plant. (w) Electrical cabling, earthing for connecting the evaporator and condensing unit in the cold store. (x) Painting for the complete plant. (xi) Suitable Stabilizer for cold storage included in the quoted rate. (y) Provision of electric connection wire of suitable size min 50mtr length with plug top Note :- Design and all parameters of pre fabricated room shall be approved by GE before procurement of materials.
Design and supply of MS fabricated trolley for mounting of cold storage of size 2.37 x 2.37 x 2.4 mtr fabricated out of 100 x 50mm MS Channel section (heavy duty) as main chasis with having four wheel with inflatable rubber tyre , tow bars on the front and hook on the rear. Tow bar on the fron shall have turning radius 10mtr. Main Chasis shall be fixed with 4 nos heavy duty lifting lugs and spreader bar. Main Chasis shall be so designed to have vrbratory load of 6 tonne and suitable to install a walk in cold storage room of size 2.37x2.37x2.4mtr including out door its unit all the steel surface shall be provided with two coat of synthetic enamel paint over a coat of red oxide primer complete all as directed by Engineer in Charge. Note: 1. Before fabrication of trolley contractor shall get the design of trolley by OEM of Cold Storage as per item 1 above for approved of GE. any change in design as recommaded by OEM shall be implemented by contractor without any extra cost and shall be deemmed to be included in quoted unit rate.
M/s Karbhagam Sales Agency
EVEREST COOLING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .