Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 UDYAM UP 04 0001727 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | -9.99% | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.0 CrAdmitted-Finance GULALI VATIKA GEETA VATIKA SHAHPUR DISTRICT GORAKHPUR | -6.20% | ₹6.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.0 CrAdmitted-Finance | -5.51% | ₹6.0 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Rejected as per Evaluation |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Rejected as per Evaluation |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
15 May 2026, 12:00 pmClosed
Superintending Engineer
Office of the SE PMGSY Circle PWD Gorakhpur
Construction work of Residential building for Officers and Staff of State Tax department in District Mau
2026_CEPLK_1141297_1
623/BUILDING TENDER-AZA-PMGSY CIR-GKP/2026 Date 02-04-2026
Open Tender
Civil Works - Buildings
365 days
MAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹12.8 L
Gorakhpur
10 Jun 2026
28 Apr 2026
15 May 2026
28 Apr 2026
15 May 2026
28 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. DSR 2.6.1(Excluding cost of GST & Labour cess) | 1,458.9 | Cum | 121.5 | ₹1,77,256.35 | BI01010001010000000000000515BI0100001112 |
| 2 | Cartage Earth Excavating. Supplying, stacking and filling of local earth (including roylaty) by mechhanical transport upto a lead of 8 km. also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation AR(Excluding cost of GST & Labour cess) | 1,967.68 | Cum | 330 | ₹6,49,334.4 | BI01010001010000000000000515BI0100001113 |
| 3 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 (1 cement:2 coarse sand) to match the existing floor. With Chlorpyriphos/ Linadane E.C. 20% with 1% concentration.DSR-2.35.3(Excluding cost of GST & Labour cess) | 1,419.28 | Sqm | 212 | ₹3,00,887.36 | BI01010001010000000000000515BI0100001114 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.DSR-2.27(Excluding cost of GST & Labour cess) | 192.43 | Cum | 1,454 | ₹2,79,793.22 | BI01010001010000000000000515BI0100001115 |
| 5 | Providing & laying of light cinder filling under floor of toilets & other sunken roofs. MR(Excluding cost of GST & Labour cess) | 55.59 | Cum | 1,615 | ₹89,777.85 | BI01010001010000000000000515BI0100001116 |
| 6 | Construction of drain along with apron.Size 150 X 150mm. As per analysis (Excluding cost of GST & Labour cess) | 239.58 | Rm | 648 | ₹1,55,247.84 | BI01010001010000000000000515BI0100001117 |
| 7 | Providing and laying in cement concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR-4.1.8(Excluding cost of GST & Labour cess) | 246.72 | Cum | 4,664.5 | ₹11,50,825.44 | BI01010001010000000000000515BI0100001118 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Concrete of M30 grade with minimum cement content of 350 kg /cum for Coloumn above Plinth DSR-5.3(Excluding cost of GST & Labour cess) | 721.89 | Cum | 7,958.5 | ₹57,45,161.56 | BI01010001010000000000000515BI0100001119 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Concrete of M30 grade with minimum cement content of 350 kg /cum UP TO Plinth DSR-5.1.2(Excluding cost of GST & Labour cess) | 622.02 | Cum | 6,257 | ₹38,91,979.14 | BI01010001010000000000000515BI0100001120 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) DSR- 6.1.2(Excluding cost of GST & Labour cess) | 189.09 | Cum | 4,884 | ₹9,23,515.56 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
Tendernotice_2.pdf
PDF • 3.70 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_2131412.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid