| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹28.4 L+₹1.5 L (5.42%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹28.6 L+₹1.6 L (5.83%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹31.6 L
EMD Value
₹63,200
Closing Date
11 Mar 2024, 12:00 pmClosed
EE MLCD BANDA
EE MLCD BANDA
Construction of R.C.C. Pedestal for 630 MM Pipe line main canal chainage 730 to 1180 Mtr. At Ramjanki Pump Canal near village Ganchha block Badhokarkhurd distt., banda .
2024_UPIDM_910470_2
09/MLCD/2023-24
Open Tender
Civil Works
Item Rate
45 days
BANDA
Construction of R.C.C. Pedestal for 630 MM Pipe line main canal chainage 730 to 1180 Mtr. At Ramjanki Pump Canal near village Ganchha block Badhokarkhurd distt., banda .
2 documents required · 2 mandatory
₹2,354
₹63,200
Yes
16 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
Total Excavation work in foundation in ordinary soil (Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation treches or into the plinth and removal and disposal of surplus earth as direction by the Engineering charge upto a distance of 30m (100ft) from the foundation trenches. Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at RJPC etc.)
Total Cement concrete work with 4cm (1/2") gauge approved stone ballast approved coarse sand, cement in the proportion 1:4:8 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. ( In Footing ) Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at NRJPC etc.)
Total Cement concrete work with 2cm (3/4") gauge approved stone ballast approved coarse sand, cement in the proportion 1:1.5:3 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. ( In Footing ) Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at RJPC etc.)
Total Centering & shuttering work for R.C.C. slabs, lintels & simple beams including all materials & T&P ( In Footing ) Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at RJPC etc.)
Total Centering & shuttering work for T-beams & columns including all materials & T&P (Above Ground Level) Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at RJPC etc.)
Total Reinforcement work for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete, TMT bars Fe500D. Note:- (Including cost of all material, labour T & P and safety equipment for completion of work at RJPC etc.)
M/S VIVEK KUMAR SINGH
ALOK ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .