Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC 6 4 70 ADARSH NAGAR SAI BABA NAGAR ARAMGHAR RAJENDRANAGAR RANGA REDDY TELENGANA PIN 500052 | RANGA REDDY | TELANGANA | 500052 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.4 L+₹8,775 (2.01%)Rejected-Finance 6 4 70 ADARSHNAGAR NEAR SHIVARAMPALLY RAILWAY STATION RAJENDRANAGAR RANGAREDDY 500077 | RANGA REDDY | TELANGANA | 500077 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical The Firm has not submitted required documents as per NIT. |
Tender Value
₹4.4 L
EMD Value
₹9,000
Closing Date
22 Apr 2025, 10:00 amClosed
AC Engineer SZ HQr
CONTRACT CELL SOUTH ZONE HQR CRPF HYDERABAD TELANGANA PIN 500005
CONSTRUCTION OF PLINTH SIZE 16X 24 FT TOILET BLOCK FOR 247 VS BN PLATOON LOCATION AT PS NARSHINGI, GANDIPET, HYDERABAD
2025_CRPF_855728_1
B.V-4/2024-25-SZ-Works (GC HYD) M and S T/028
Open Tender
Civil Works
Item Rate
60 days
247 VS BN PLATOON PS NARSHINGI GANDIPET HYDERABAD
As per NIT
3 documents required · 3 mandatory
₹0
₹9,000
19 May 2025
5 Apr 2025
22 Apr 2025
5 Apr 2025
22 Apr 2025
5 Apr 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming andwatering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement: 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.
20 mm cement plaster of mix : 1:4 (1 cement : 4 Coarse sand)
20 mm cement plaster of mix : 1:6 (1 cement : 6 Coarse sand)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Komere Manoj Kumar (BID ID -3203904)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .