Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | ₹26.0 L Quoted ₹42.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.5 LRejected-AOC SHOP NO 15 AMBALA CANTT AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | ₹49.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R.R AND CO | ESWARI ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Collection of coal mill rejects from the chutes at an interval of 20 minutes, dumping in the specified area and cleaning around the mill and ground floor level. The following procedure is involved. (Works A to C involved).
a) Closing the tramp iron chute inlet valve and opening the outlet valve of the chute, collecting the rejects in the wheel barrow, loading and dumping in the specified area.
b) Normalizing the system by closing the outlet and opening the inlet valves.
c) Cleaning all rejects and debris around the mill and keeping the ground floor neat and tidy. | 2,844 | Opn | 34,12,800 ₹40.3 L | 28,44,000 ₹33.6 L |
| 2.00 | Charges for cooling the mill rejects by continuous spraying of water using hose. | 3,500 | MT | 6,65,000 ₹7.8 L | 6,12,500 ₹7.2 L |
| 3.00 | Loading mill rejects/released chocked Coal Collected Near Mill/Feeder Area from, weighing in departmental weigh bridge and transporting to reject yard “G”/ switch yard area/coal yard/by using Contractor’s vehicle and unloading the same and return. | 3,500 | MT | 8,75,000 ₹10.3 L | 7,87,500 ₹9.3 L |
Tender Value
Refer Docs
EMD Value
₹28,600
Closing Date
2 Jan 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM I Unit II Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
2025_EB_633638_1
CE/SE/O/TTPS/Spec.No.58/26-27
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹28,600
Yes
CE/TTPS
23 Mar 2026
20 Dec 2025
3 Jan 2026
20 Dec 2025
2 Jan 2026
20 Dec 2025
20 Dec 2025
Collection of coal mill rejects from the chutes at an interval of 20 minutes, dumping in the specified area and cleaning around the mill and ground floor level. The following procedure is involved. (Works A to C involved). a) Closing the tramp iron chute inlet valve and opening the outlet valve of the chute, collecting the rejects in the wheel barrow, loading and dumping in the specified area. b) Normalizing the system by closing the outlet and opening the inlet valves. c) Cleaning all rejects and debris around the mill and keeping the ground floor neat and tidy.
Charges for cooling the mill rejects by continuous spraying of water using hose.
Loading mill rejects/released chocked Coal Collected Near Mill/Feeder Area from, weighing in departmental weigh bridge and transporting to reject yard “G”/ switch yard area/coal yard/by using Contractor’s vehicle and unloading the same and return.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_758098.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid