Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-Finance lowest | |
| 2 | L2₹1.1 L+₹2,000 (1.90%)Rejected-Finance JAMMU AND KASHMIR | L2 | Rejected-Finance not lowest | |
| 3 | Not Admitted-Fee/PreQual/Technical GANGYAL JAMMU | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L1 | js electrical and machanical works L2 |
|---|---|---|---|---|---|
| 1.00Dismantling, Material Handling, Re-installation, testing & Commissioning of electromechanical machinery of LIS Suhagani due to complete dismantling of existing pump room and construction of new pump room. | |||||
| 1.01 | i) Dismantling & Extraction
a)Decoupling and unbolting of 3 Pumpsets (includes pump and Motors) from base frames and removing of all pipes for all the pumpsets. Includes removal of Suction/Delivery pipe from flanges (gas cutting if required). Disconnecting all electrical connections on input as well as output side. Since the building is dilapidated, mobile tripod or chain pulley should be used
b) Disconnection and removal of 200kVA Stabilizer(stabilizer needs to be dismantlted for safe shifting), Panel, and Starter (No. 3 ,No.4 and priming starter).
ii) Logistics & Material Handling
a) Hiring of Crane/skilled labour whichever applicable for safe extraction (avoiding roof load) and loading onto vehicle. The contractor is responsible for the safety of the equipment (Motors, Pumps, 200kVA Stabilizer, Panel and starter) during the dismantling and storage phase. Any damage caused by negligence shall be rectified at the contractor's cost. Transportation to MID Store OR at safe location for unloading
b) Transportation of return trip to LIS after completion of civil work for unloading all electromechanical equipments (within 20km). Since civil work may take time, all electrical euipments must be covered with waterproof sheets to prevent moisture damage.
iii) Re-installation & Integration
a) fitting/reinstallation of all the three pumps at the base frame, coupling with their respective motor by making proper alignment and testing on partial/full load. Precision Alignment for all three pumpset no.1,2 and 3 (Tolerance < 0.05mm)
b) Ensure the panel , starter are cleaned with specialized cleaners before re-termination to prevent arcing.Re-fitting of voltage stabilizer , Fitting of the starter on the board by way of skilled labour / semi-skilled labour and panel at repective location ,connecting all the electrical connection of motor no..1, 2 and 3 with fitting of flexible copper cable from panel to starter and then starter to motor, and cover the flexible copper cable with heavy duty PVC sleeve/ appropriate size of conduit.
iv) Priming & Piping Network
a) Installation of Priming Delivery Pipes (GI/MS) including valves for all 3 pumpsets.
b) Re-fitting of suction/delivery pipes for all the three pumpset no.1, 2 and 3 with new gaskets and high-tensile bolts.welding to be used wherever required
v) Testing & Commissioning
a) Megger testing, No-load run, and Full-load 5 Cusec performance verification.
complete job | 1 | Job | 1,05,000 ₹1,05,000 Lowest | 1,07,000 ₹1,07,000 |
Tender Value
₹1.1 L
EMD Value
₹2,220
Closing Date
20 Jan 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN MID JAMMU
MID JAMMU
MID/J/143
2026_IFC_300642_1
MID/J/e-NIT/2025-26/143
Open Tender
Repair and Maintenance Works
Item Wise
60 days
suhagani
as per tender notice
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹2,220
21 Jan 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
i) Dismantling & Extraction a)Decoupling and unbolting of 3 Pumpsets (includes pump and Motors) from base frames and removing of all pipes for all the pumpsets. Includes removal of Suction/Delivery pipe from flanges (gas cutting if required). Disconnecting all electrical connections on input as well as output side. Since the building is dilapidated, mobile tripod or chain pulley should be used b) Disconnection and removal of 200kVA Stabilizer(stabilizer needs to be dismantlted for safe shifting), Panel, and Starter (No. 3 ,No.4 and priming starter). ii) Logistics & Material Handling a) Hiring of Crane/skilled labour whichever applicable for safe extraction (avoiding roof load) and loading onto vehicle. The contractor is responsible for the safety of the equipment (Motors, Pumps, 200kVA Stabilizer, Panel and starter) during the dismantling and storage phase. Any damage caused by negligence shall be rectified at the contractor's cost. Transportation to MID Store OR at safe location for unloading b) Transportation of return trip to LIS after completion of civil work for unloading all electromechanical equipments (within 20km). Since civil work may take time, all electrical euipments must be covered with waterproof sheets to prevent moisture damage. iii) Re-installation & Integration a) fitting/reinstallation of all the three pumps at the base frame, coupling with their respective motor by making proper alignment and testing on partial/full load. Precision Alignment for all three pumpset no.1,2 and 3 (Tolerance < 0.05mm) b) Ensure the panel , starter are cleaned with specialized cleaners before re-termination to prevent arcing.Re-fitting of voltage stabilizer , Fitting of the starter on the board by way of skilled labour / semi-skilled labour and panel at repective location ,connecting all the electrical connection of motor no..1, 2 and 3 with fitting of flexible copper cable from panel to starter and then starter to motor, and cover the flexible copper cable with heavy duty PVC sleeve/ appropriate size of conduit. iv) Priming & Piping Network a) Installation of Priming Delivery Pipes (GI/MS) including valves for all 3 pumpsets. b) Re-fitting of suction/delivery pipes for all the three pumpset no.1, 2 and 3 with new gaskets and high-tensile bolts.welding to be used wherever required v) Testing & Commissioning a) Megger testing, No-load run, and Full-load 5 Cusec performance verification. complete job
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_975234.xls
BOQ • 0.28 MB
SBD143.pdf
Additional Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .