Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-AOC 39 1 FIRST CROSS STREET NEDUMARAN NAGAR DHARMAPURI | ₹7.4 Cr Quoted ₹7.8 Cr | L1 | Accepted-AOC Quoted less percentage |
| 2 | L2₹8.6 Cr+₹74.5 L (9.52%)Rejected-AOC | ₹8.6 Cr+₹74.5 L (9.52%) | L2 | Rejected-AOC Quoted above percentage |
| 3 | Not Admitted-Fee/PreQual/Technical 41 2 FIRST CROSS STREET NEDUMARAN NAGAR DHARMAPURI | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹7.4 Cr
EMD Value
₹3.8 L
Closing Date
14 Oct 2019, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance, Salem Circle
Strengthening, Widening, Improvements, Improvements to Riding Quality to Government Roads including CD works, Well Protective Wall and Reconstruction of Box culvert and up keeping the roads for a period of 60 months in Uthangarai (H) Package.72
2019_HWAY_137808_1
TN.7/19-20/HDO, Dt.06.09.2019-20
Open Tender
Civil Works - Highways
Percentage
240 days
Krishnagiri
Refer tender document
3 documents required · 3 mandatory
₹0
₹3.8 L
7 Feb 2020
13 Sept 2019
1 Nov 2019
13 Sept 2019
14 Oct 2019
21 Sept 2019
16 Sept 2019 - 20 Sept 2019
eProcurement System Government of Tamil Nadu Created By: Sumathy D Created Date/Time: 14-Nov-2019 04:55 PM Tender Title: Krishnagiri Package 72 Tender ID: 2019_HWAY_137808_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Strengthening, Widening, Improvements, Improvements to Riding Quality to Government Roads including CD works, Well Protective Wall and Reconstruction of Box culvert and up keeping the roads for a period of 60 months in Uthangarai (H) C&M Sub Division (Package72) The Following works are involved in this package 1. Widening from Single lane to Intermediate lane and Strengthening of Morrappur - Kallavi Road at Km 11/0-13/0 including CD works including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3685) 2. Widening from Single lane to Intermediate lane and Strengthening of Morrappur - Kallavi Road at Km 13/0-14/880 including CD works including upkeeping for a period of 60 months (01-CRIDP-19-20-P-3684) 3. Widening from Single lane to Intermediate lane and Improvements of Kallavi - Anandhur Road at Km 1/0-2/0 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2731) 4. Improvements of Uthangarai - Nochipatty Road at Km 1/2-1/6, 2/2-2/6 and 4/4-5/0 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2744) 5. Improvements of Pochampalli-Kallavi road Km 1/8 to Jandamedu-Puliyur road Km 8/10 (via) Vendrampalli, Daddapatty at Km 0/0-1/2 including CD works including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2745) 6. Reconstruction of Box Culvert at Km 0/2, 0/4, 1/4, 1/10, 2/8 & 4/6 of Singarapet-Thirupathur Road km 19/8 to Salem Thirupathur road (via) Musilikottai including Construction of well protection wall at Km 6/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2751) 7. Improvements of Thoppadikuppam A.D.Colony cross road (via) Thoppadikuppam at Km 2/8-3/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2746) 8. Reconstruction of Box culvert at Km 0/10 & 1/4 of Thoppadikuppam A.D.Colony cross road (via) Thoppadikuppam (01-CRIDP-19-20-O-2754) 9. Improvements to Riding Quality at Km 0/0-3/0 and 4/0-7/4 of Singarapet-Thirupathur Road km 19/8 to Salem Thirupathur road (via) Musilikottai including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4643) 10. Improvements to Riding Quality at Km 0/0-2/8 of Thoppadikuppam - A.D.Colony cross road (via) Thoppadikuppam including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4655)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 sasi Road finishers and engineering contractors 66497070.420 5.000 78200555.000 Seven Crore Eighty Two Lakh Five Hundred and Fifty Five
2.00 D S Akbal 66497070.420 15.000 85648227.000 Eight Crore Fifty Six Lakh Fourty Eight Thousand Two Hundred and Twenty Seven
Lowest Amount Quoted BY: sasi Road finishers and engineering contractors(78200555.000)
BOQ Summary Details Tender Title: Krishnagiri Package 72 Tender ID: 2019_HWAY_137808_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 sasi Road finishers and engineering contractors 78200555.000 L1
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .