| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.0 LAccepted-AOC | ₹95.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance 554 174 KA 1 CHHOTA BARHA ALAMBAGH LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | - | - | Rejected-Technical found not eligible |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ARYAN ENTERPRISES L2 | UDAY RAJ L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation including initial lead upto 30 m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. | 579.53 | Cum | 96 ₹55,634.88 | 76 ₹44,044.28 Lowest |
| 2.00 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. | 157.82 | Sqm | 735 ₹1,15,997.7 | 586 ₹92,482.52 Lowest |
| 3.00 | P C C 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. | 36.33 | Cum | 8,530 ₹3,09,894.9 | 6,800 ₹2,47,044 Lowest |
| 4.00 | M-150 1st Class Brick work in 1:4 cement mortar including cost of material ,labour T&P etc for complete work. | 266.77 | Cum | 6,190 ₹16,51,306.3 | 5,003 ₹13,34,650.31 Lowest |
| 5.00 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. | 401.46 | Sqm | 210 ₹84,306.6 | 160 ₹64,233.6 Lowest |
| 6.00 | Providing and laying outlet for 110 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. | 430 | Rm | 300 ₹1,29,000 | 226 ₹97,180 Lowest |
| 7.00 | Providing and laying outlet for 160 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. | 20 | Rm | 690 ₹13,800 | 460 ₹9,200 Lowest |
| 8.00 | Dry earth filling including manual compaction dressing lead up to 30 mt lift up to 1.50 in trench of outlet. | 91.6 | Cum | 101 ₹9,251.6 | 82 ₹7,511.2 Lowest |
| 9.00 | Struck deep cement pointing in 1:2 cement mortar including all cost of material labour T&P etc for completion of work. | 218.15 | Sqm | 135 ₹29,450.25 | 103 ₹22,469.45 Lowest |
| 10.00 | Providing & Fixing upto 2.00 sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. | 3 | Nos | 4,58,000 ₹13,74,000 | 3,64,600 ₹10,93,800 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
23 May 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-02 LOT-05
2026_UPIDC_1149249_5
02/SE-VII/2026-27
Open Tender
Civil Works - Canal
Item Rate
270 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,268
₹2.5 L
Lucknow
14 Aug 2026
18 May 2026
23 May 2026
18 May 2026
23 May 2026
18 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation including initial lead upto 30 m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. | 579.53 | Cum | - | - |
| 2 | Centering & shuttering for P.C.C. including cost of Shuttering, T&P etc. for complete work. | 157.82 | Sqm | - | - |
| 3 | P C C 1:3:6 With Cement course sand 4.75 to 20 mm gauge kabrai stone grit including cost of matarial labour and t&p etc. | 36.33 | Cum | - | - |
| 4 | M-150 1st Class Brick work in 1:4 cement mortar including cost of material ,labour T&P etc for complete work. | 266.77 | Cum | - | - |
| 5 | 10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. | 401.46 | Sqm | - | - |
| 6 | Providing and laying outlet for 110 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. | 430 | Rm | - | - |
| 7 | Providing and laying outlet for 160 mm dia HDPE Pipe PN-6: Class PE - 100 including all cost of matarial, labour and T & P etc. | 20 | Rm | - | - |
| 8 | Dry earth filling including manual compaction dressing lead up to 30 mt lift up to 1.50 in trench of outlet. | 91.6 | Cum | - | - |
| 9 | Struck deep cement pointing in 1:2 cement mortar including all cost of material labour T&P etc for completion of work. | 218.15 | Sqm | - | - |
| 10 | Providing & Fixing upto 2.00 sqm steel gate on head including cost of all material labour and T&P etc. required for completion of work. | 3 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2151667.xls
BOQ • 0.35 MB
BID02LOT05.pdf
Tender Documents • 2.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].