Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 CrAccepted-Finance ROMA BANJARA TANDA CHS BUILDING NO 1 ROOM NO 506 MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹1.7 Cr | 1 | Accepted-Finance Being L-1 |
| 2 | 2₹1.8 Cr+₹5.9 L (3.39%)Rejected-Finance SHOP NO 14 VIRAL APARTMENT OPP SHOPPERS STOP S V ROAD ANDHERI W MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | ₹1.8 Cr+₹5.9 L (3.39%) | 2 | Rejected-Finance Being L-2 |
| 3 | 3₹1.8 Cr+₹7.9 L (4.51%)Rejected-Finance MUMBAI 400074 ACHARYA COOMERCIAL SHOPPING CENTRE 119 1ST FLOOR ACHARYA COMMERCIAL AND SHOPPING CENTRE DR C G ROAD NEAR BASANT CINEMA CHEMBUR MUMBAI 400074 DR C G ROAD | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | ₹1.8 Cr+₹7.9 L (4.51%) | 3 | Rejected-Finance Being L-3 |
| 4 | 4₹1.9 Cr+₹15.6 L (8.97%)Rejected-Finance MUMBAI THANE MAHARASHTRA | ₹1.9 Cr+₹15.6 L (8.97%) | 4 | Rejected-Finance Being L-4 |
| 5 | 5₹2.0 Cr+₹21.2 L (12.2%)Rejected-Finance 001 HPS MARKET KANPUR GANDHI CHAURAHA RAEBARELI UTTAR PRADESH 229206 UDYAM UP 62 0025959 | RAE BARELI | UTTAR PRADESH | 229206 | ₹2.0 Cr+₹21.2 L (12.2%) | 5 | Rejected-Finance Being L-5 |
| Sl No | Description | Qty | Unit | Bharat Construction Company (Bombay) L2 | ANUBHAV ENGINEERING COMPANY L3 | Shree Enterprises L5 | SUNIL CONSTRUCTION L1 | RESHMA CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing Stone rubble masonry (In cement mortar) manually / by mechanical means carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge | 10 | CuM | 1,441 ₹14,410 | 400 ₹4,000 | 300 ₹3,000 Lowest | 1,400 ₹14,000 | 600 ₹6,000 |
| 2.00 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge. | 2 | CuM | 1,269 ₹2,538 | 700 ₹1,400 | 300 ₹600 Lowest | 1,500 ₹3,000 | 800 ₹1,600 |
| 3.00 | Dismantling Kerb stone carefully without damaging the stone, including removal of earth, base pcc etc. and refixing the same in line and level on newly laid base PCC 1:3:6 and pointing the exposed faces in cement mortar 1:3, curing etc. complete as directed by the Engineer in charge. The rate shall also include charges for disposal of unserviceable materials within 50 m lead. The base PCC laid shall be paid separately under relevant item. | 15 | M | 1,269 ₹19,035 | 250 ₹3,750 Lowest | 350 ₹5,250 | 700 ₹10,500 | 400 ₹6,000 |
| 4.00 | Labour charges for dismantling existing shahbad stone pavement in footpaths, in Plinth Protection etc. carefully without damaging and re-laying the same over a bed of stone grit 150mm consolidated thickness, to proper slope, including cutting the edges to proper lines and sunk pointing with Cement mortar 1:3 with 15mm x 10mm groove cross wire and longitudinally and curing etc. complete (Grit to be provided by the Contractor). | 30 | SqM | 1,269 ₹38,070 | 600 ₹18,000 | 350 ₹10,500 Lowest | 700 ₹21,000 | 1,000 ₹30,000 |
| 5.00 | Dismantling and demolition of existing RCC slab carefully approx. size of 10.0m x 6.60m x 0.3m (thick including pcc), etc. by using DUST FREE DIAMOND WIRE SAW CUTTING / WALL SAWING / SUITABLE BLADE CUTTING SYSTEM with remote operation arrangements. Lowering the cut slabs carefully without damaging adjacent structures using suitable capacity cranes/jcb, stacking of Unserviceable materials at designated locations inside the BARC premises upto a lift of 10m and lead of 2 km as per the the drawings and instructions of Engineer-in-Charge. (Measurement shall be as per cutting cross sectional area of RCC structures only) .Note: 1. Pneumatic/Electric breaker/chipper shall not be used for breaking of RCC and other components of slab.2. The quoted rate shall include for all tools & Tackles, Providing hooks to handle the cut slab, core cutting, equipment's, machinery, consumables, gas cutting, welding, scaffolding, temporary support systems,& dismantling at any height, safety arrangements as per BARC requirements.3. The necessary cutting surface is on the road surface 4. No materials from slab cutting shall be allowed to take outside BARC 5. The volume of debris shall be calculated on slab sizes and measurement will be paid for same quantity in the corresponding items. 6. Only RCC slab cutting area will be measured for payment.7. Minimum cutting road slab area should not be less than 2.0 X1.1 SqM. | 30 | SqM | 3,367 ₹1,01,010 | 26,000 ₹7,80,000 | 800 ₹24,000 Lowest | 25,000 ₹7,50,000 | 10,000 ₹3,00,000 |
| 6.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including
shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from Average Ground Level | 1,275 | CuM | 603 ₹7,68,825 | 350 ₹4,46,250 Lowest | 650 ₹8,28,750 | 400 ₹5,10,000 | 500 ₹6,37,500 |
| 7.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including
shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge.
From 1.50 to 3.00m depth from Average Ground Level | 1,240 | CuM | 603 ₹7,47,720 | 400 ₹4,96,000 Lowest | 800 ₹9,92,000 | 500 ₹6,20,000 | 550 ₹6,82,000 |
| 8.00 | Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 700 | SqM | 549 ₹3,84,300 | 500 ₹3,50,000 Lowest | 550 ₹3,85,000 | 600 ₹4,20,000 | 600 ₹4,20,000 |
| 9.00 | Providing and laying in position cement concrete of 1:2:4/ M-15 with minimum cement content 320 Kg/Cum (1 cement, 2 crushed sand, 4 graded stone aggregate of nominal size 20 mm) including consolidation, finishing, curing etc. complete as per specification and drawings but excluding the cost of Formwork shuttering, centering and steel reinforcement at all Levels .
Note: Minimum Cement Content to be as per the latest revision of the relevant IS Codes. | 50 | CuM | 8,479 ₹4,23,950 | 7,500 ₹3,75,000 Lowest | 7,800 ₹3,90,000 | 7,500 ₹3,75,000 Lowest | 8,400 ₹4,20,000 |
| 10.00 | Providing and laying in position cement concrete of 1:3:6/M-10 with minimum cement content 220 Kg/Cum (1cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per pecificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels.
Note: Minimum Cement Content to be as per the latest revision of the relevant IS Codes. | 65 | CuM | 7,992 ₹5,19,480 | 6,500 ₹4,22,500 Lowest | 7,000 ₹4,55,000 | 7,300 ₹4,74,500 | 7,800 ₹5,07,000 |
Tender Value
₹1.9 Cr
EMD Value
₹4.5 L
Closing Date
29 Jun 2026, 3:00 pmClosed
Chief Engineer, CED
Civil Engineering Division, BARC
Construction of Precast RCC Culvert at Central Avenue Road and RCC drain towards downstream side, inside BARC, Trombay, Mumbai.
2026_BARC_910076_1
BARC/CED/ET/14/2026-2027 DATE 21/05/2026
Open Tender
Civil Works
Item Rate
365 days
Central Avenue Road, BARC, Trombay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹4.5 L
Civil Engineering Division, BARC
15 Sept 2026
28 May 2026
3 Jul 2026
28 May 2026
29 Jun 2026
15 Jun 2026
28 May 2026 - 5 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Stone rubble masonry (In cement mortar) manually / by mechanical means carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge | 10 | CuM | - | - |
| 2 | Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge. | 2 | CuM | - | - |
| 3 | Dismantling Kerb stone carefully without damaging the stone, including removal of earth, base pcc etc. and refixing the same in line and level on newly laid base PCC 1:3:6 and pointing the exposed faces in cement mortar 1:3, curing etc. complete as directed by the Engineer in charge. The rate shall also include charges for disposal of unserviceable materials within 50 m lead. The base PCC laid shall be paid separately under relevant item. | 15 | M | - | - |
| 4 | Labour charges for dismantling existing shahbad stone pavement in footpaths, in Plinth Protection etc. carefully without damaging and re-laying the same over a bed of stone grit 150mm consolidated thickness, to proper slope, including cutting the edges to proper lines and sunk pointing with Cement mortar 1:3 with 15mm x 10mm groove cross wire and longitudinally and curing etc. complete (Grit to be provided by the Contractor). | 30 | SqM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 8.04 MB
Tendernotice_2.pdf
PDF • 1.46 MB
ProformaofScheduleET14.pdf
Tender Documents • 1.31 MB
BOQ_956496.xls
BOQ • 0.27 MB
ScheduleAET14.pdf
Tender Documents • 0.34 MB
TechnicalbidET14.xls
Tender Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .