Tender Value
₹8.5 L
EMD Value
₹19,998
Closing Date
9 Jul 2026, 6:55 pmDue today
Pankaj Garg
Municipal Committee Bawani Khera
7th time tender for Construction of Room of Daksh Perjapati Dharamshala at MC Bawani Khera
2026_HRY_533081_1
20264148390D D9D6 46B2 8531 F9355B153FD0343ULB
Open Tender
Civil Works
240 days
Bawani Khera
2 documents required · 2 mandatory
₹1,000
₹19,998
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 7.22.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level in all shapes and sizes in
: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 4488.00 Through Rate | 1 | cum | 4,488 | ₹4,483.51 |
| 2 | HSR Item 7.28.1-Half brick masonry with common burnt clay
non-modular bricks of class designation 10.5 in superstructure
above plinth level up to floor IV level. 1. Cement mortar 1:3 (1
cement :3 coarse sand)
HSR Rate(Rs.) 519.00 Through Rate | 0.8 | Sqm | 519 | ₹414.68 |
| 3 | HSR Item 6.15.1-Reinforced cement concrete work in walls
(any thickness), including attached pilasters, buttresses, plinth
and string courses, fillets, columns, pillars, piers, abutments,
posts and struts etc. above plinth level up to floor four level,
excluding cost of centering, shuttering, finishing and
reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zoneIII) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 5969.00 Through Rate | - | cum | 5,969 | - |
| 4 | HSR Item 6.30.5-Centering and shuttering including strutting,
propping etc. and removal of form for 5. Lintels, beams, plinth
beams, girders, bressumers and cantilevers
HSR Rate(Rs.) 296.00 Through Rate | 0.2 | Sqm | 296 | ₹59.2 |
| 5 | HSR Item 6.30.3-Centering and shuttering including strutting,
propping etc. and removal of form for 3. Suspended floors,
roofs, landings, balconies and access platform
HSR Rate(Rs.) 208.00 Through Rate | 0.4 | Sqm | 208 | ₹83.2 |
| 6 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where
not included in the complete rate of RCC, including
straightening, cutting, bending, placing in position, binding,
wastage, overlaps, welded joints, spacer bars, chairs, stays,
hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
HSR Rate(Rs.) 68.00 Through Rate | - | Kg | 68 | - |
| 7 | HSR Item 13.21.2-Supply and fixing Windows frames
(Chowkhats) including mullions consisting frame fabricated from sheet roll formed out of 1.2mm thick galvanized sheet as per IS:277 (Base steel as per IS 513) with zinc of 120 gm/sqm and Powder coated with pure Polyester powder up to 50 microns (as per approved colour), 3 Nos. 100mm butt - hinges
2mm thick, 6 Nos. 1.2mm thick CRCA electroplated stiffner, 6 Nos. M.S hold fast with split and tail welded to stiffner plate 200mm long, receiver for aldrop, weld less corner assembly with brackets and screws, M.S tie rod 50mm x 25mm to be fixed at bottom finished with powder coated total thickness of coating 0.6mm of approved shade, fixed in position including the cost of cement concrete for 1:2:4 for fixing lugs complete
in all respects as per drawing, design, specification and entire satisfaction of Engineer-in-charge. 2. Door Frame of size 125mm x 60mm with 37mm wide double rebate for 35mm door shutter
HSR Rate(Rs.) 1240.00 Through Rate | 1 | Metre | 1,240 | ₹1,238.76 |
| 8 | HSR Item 13.29.2-Steel work welded in built up sections/
framed work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required. 2. In gratings, frames, guard
bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg | 83 | - |
| 9 | HSR Item 6.16-Reinforced cement concrete work in beams,
suspended floors, roofs having slope up to 15° landings,
balconies, shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases above plinth level up to floor
four level, excluding the cost of centering, shuttering, finishing
and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand
(zone-III) : 3 graded stone aggregate 20 mm nominal size).
HSR Rate(Rs.) 6113.00 Through Rate | 1 | cum | 6,113 | ₹6,106.89 |
| 10 | HSR Item 6.30.6-Centering and shuttering including strutting,
propping etc. and removal of form for 6. Columns, Pillars,
Piers, Abutments, Posts and Struts
HSR Rate(Rs.) 262.00 Through Rate | - | Sqm | 262 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_612150.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid