Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹7.5 L Quoted ₹7.4 L | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Accepted |
| Sl No | Description | Qty | Unit | SAHIRA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Overhauling Hydraulic test and Re-assembling of Safety valve of size 4”/2”/300 class. Removing the safety Relief valve 4”/2”/300 class from LP Heater, Gland cooler-I & Flanges & Stud heating system Disassembling the Safety Relief Valve cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with inlet and outlet flange gaskets. Including of consumables and T&P’s. | 9 | Nos | 8,550 ₹76,950 |
| 2.00 | Charges for Overhauling Hydraulic testing and Re-assembling of Safety valve of size 6”/8”/40/64 ATA
Removing the safety Relief valve size 6”, 8”/40, 64 ATA from HP Heaters & Deaerator Feed water tank, Disassembling the Safety Relief Valve cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with inlet and outlet flange gaskets. Including of consumables and T&P’s. | 9 | Nos | 15,450 ₹1.4 L |
| 3.00 | Charges for OVERHAULING of Auxiliary steam SAFETY VALVE in Deaerator Floor: (CRH)
This work comprises of dismantling, cleaning lapping the seat and disc assembling without disturbing its initial settings. Including cost of consumables and T&P’s. | 18 | Nos | 18,350 ₹3.3 L |
| 4.00 | Charges for Safety valve floating by engaging approves agency having done Trevi test. Adjusting the valve to required pressure setting and producing the certificate as per requirement. Including of test kit, consumables and T&P charges. | 18 | Nos | 10,950 ₹2.0 L |
Tender Value
Refer Docs
EMD Value
₹7,100
Closing Date
4 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 TM Dn Overhauling and Pressure Testing of various Types of Safety Relief valves in High Pressure Low Pressure Heaters Deaerators and Auxiliary Steam Supply lines of Deaerators of Feed Water System
2025_EB_575988_1
CE SE MI NCTPS I 69 25 26
Open Tender
Power/Energy Projects/Products
120 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,100
Yes
27 Apr 2026
1 Jul 2025
5 Jul 2025
1 Jul 2025
4 Jul 2025
1 Jul 2025
Amount
Charges for Overhauling Hydraulic test and Re-assembling of Safety valve of size 4”/2”/300 class. Removing the safety Relief valve 4”/2”/300 class from LP Heater, Gland cooler-I & Flanges & Stud heating system Disassembling the Safety Relief Valve cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with inlet and outlet flange gaskets. Including of consumables and T&P’s.
Charges for Overhauling Hydraulic testing and Re-assembling of Safety valve of size 6”/8”/40/64 ATA Removing the safety Relief valve size 6”, 8”/40, 64 ATA from HP Heaters & Deaerator Feed water tank, Disassembling the Safety Relief Valve cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with inlet and outlet flange gaskets. Including of consumables and T&P’s.
Charges for OVERHAULING of Auxiliary steam SAFETY VALVE in Deaerator Floor: (CRH) This work comprises of dismantling, cleaning lapping the seat and disc assembling without disturbing its initial settings. Including cost of consumables and T&P’s.
Charges for Safety valve floating by engaging approves agency having done Trevi test. Adjusting the valve to required pressure setting and producing the certificate as per requirement. Including of test kit, consumables and T&P charges.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_688250.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid