| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC Bidder quoted less than estimate value |
| 2 | 2₹1.0 Cr+₹46,766 (0.45%)Rejected-Finance 15 CHINNAMUTHUR MUTHUR POST KANGEYAM TALUK TIRUPPUR DISTRICT 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.0 Cr+₹46,766 (0.45%) | 2 | Rejected-Finance Bidder quoted more than estimate value |
| Sl No | Description | Qty | Unit | senbagam construction L2 | Shri Amirtha Builders L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 318 | 1 M³ | 170 ₹54,060 | 160 ₹50,880 Lowest |
| 2.00 | Removal of excavated earth to a lead of 0 to 5 Km including cost of loading, transporting etc., complete complying with standard specification. | 191 | 1 M³ | 105 ₹20,055 | 103 ₹19,673 Lowest |
| 3.00 | Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification. | 318 | 1 M³ | 5,400 ₹17,17,200 | 5,315 ₹16,90,170 Lowest |
| 4.00 | Plain Cement Concrete M20 (Nominal Mix) using 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, expansion joint (bitumen bad)soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Hire charges for Tools and plants for cement pavement work etc.. complete as per relevant standard specifications. | 904 | 1 M³ | 7,700 ₹69,60,800 | 7,690 ₹69,51,760 Lowest |
| 5.00Add GST @ 18% | |||||
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
26 Jun 2025, 3:00 pmClosed
Commissioner
Commissioner Tiruppur City Municipal Corporation
15th_CFC_Package_01
2025_MAWS_566390_1
E1 / 2855 / 2025
Open Tender
Civil Works - Roads
Works
180 days
Tiruppur City Municipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.1 L
27 Sept 2025
9 Jun 2025
26 Jun 2025
9 Jun 2025
26 Jun 2025
9 Jun 2025
Amount
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Removal of excavated earth to a lead of 0 to 5 Km including cost of loading, transporting etc., complete complying with standard specification.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Plain Cement Concrete M20 (Nominal Mix) using 20mm and 10mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, expansion joint (bitumen bad)soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Hire charges for Tools and plants for cement pavement work etc.. complete as per relevant standard specifications.
Add GST @ 18%
senbagam construction (BID ID -1378106)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .