| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹2.9 Cr+₹5.6 L (2.00%)Rejected-AOC TANGLA UDALGURI ASSAM | UDALGURI | ASSAM | 784113 | ₹2.9 Cr+₹5.6 L (2.00%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| 4 | Rejected-Technical VILL ROUMARI WARD NO 1 P O P S ABHAYAPURI DIST BONGAIGAON ASSAM | BONGAIGAON | ASSAM | - | - | Rejected-Technical Technically Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
8 Jan 2024, 4:30 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of brick boundary wall with iron gates at Sri Sri Ganesh Temple, Lalmati, Duramari, Abhyapuri, Bongaigaon
2023_PWBNH_34798_1
T/TB-I/41/2023/05 Dated Guwahati 14th Dec 2023
Open Tender
Civil Works - Building
Item Rate
180 days
Bongaigaon
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,638
₹5.6 L
Yes
5 Feb 2024
19 Dec 2023
8 Jan 2024
19 Dec 2023
8 Jan 2024
23 Dec 2023
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming o fbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Posts & Strut
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix. 1:4 (1 cement: 4 fine sand)
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
Applying one coat of water thinable cement primer of approved brand and manufacture on wall surfaces. Water thinnable cement primer.
Finishing wall with water proofing cement paint of approved brand and manufacture of required shade. New work (Two or More coat @ 3.84 Kg/10m2
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
Pabitra Boro
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .