Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 CrAccepted-AOC E 33 PHASE I ASHOK VIHAR DELHI 110052 | DELHI | NORTH DELHI | DELHI | 110052 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹19.1 Cr+₹2.9 Cr (18.2%)Rejected-Finance A 1 C C COLONY OPP RANA PARTAP BAGH DELHI 2021R4024 | NEW DELHI | DELHI | 110001 | L2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | SATYA PARKASH AND BROS PVT LTD L2 | JKG INFRATECH PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | CIVIL ITEMS ( 1 to 28 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 18,000 | SQM | 55 ₹9,90,000 | 25 ₹4,50,000 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge.
2.6.1 All kinds of soil | 4,938 | CUM | 200 ₹9,87,600 Lowest | 250 ₹12,34,500 |
| 3.00 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 46 | CUM | 2,000 ₹92,000 Lowest | 2,500 ₹1,15,000 |
| 4.00 | Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m : | 712 | CUM | 300 ₹2,13,600 | 200 ₹1,42,400 Lowest |
| 5.00 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 14,400 | SQM | 250 ₹36,00,000 | 150 ₹21,60,000 Lowest |
| 6.00 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader/or any other mechanical mean on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge
With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20 | 4,300 | CUM | 12,000 ₹5,16,00,000 | 11,200 ₹4,81,60,000 Lowest |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher /other Mechanical means in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 3,860 | CUM | 13,500 ₹5,21,10,000 | 11,500 ₹4,43,90,000 Lowest |
| 8.00 | Providing and laying of Hot Mix Semi Dense Asphaltic Concrete (SDAC) using crushed stone aggregate of quality, size and grading as specified and filler and specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camper as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [ for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 120 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material].
Filler in order of preference may be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 683 | CUM | 35,000 ₹2,39,05,000 | 30,000 ₹2,04,90,000 Lowest |
| 9.00 | Providing and laying of Hot Mix Dense Asphaltic Concrete (DAC) using crushed stone aggregate of quality, size and grading as specified and filler and specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camper as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 135 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material].
Filler in order of preference shall be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 347 | CUM | 37,000 ₹1,28,39,000 | 32,000 ₹1,11,04,000 Lowest |
| 10.00 | Providing and laying of Hot Mix Dense Bituminous Macadam (DBM) using crushed stone aggregate of quality, size and grading as specified and #filler as specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in- Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade VG-30 shall be taken as 110 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material. Filler in order of preference shall be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 345 | CUM | 30,000 ₹1,03,50,000 | 28,000 ₹96,60,000 Lowest |
Tender Value
₹16.2 Cr
EMD Value
₹48.7 L
Closing Date
21 Mar 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy General Manager (Engg-Civil)
Office of Deputy General Manager (Engg-Civil) Civil Engg. Dept. , Airports Authority of India , Agatti Airport -682553
Construction of Apron for parking 2 No. ATR-72 type of Aircraft and connecting road to terminal building at Agatti Airport
2025_AAI_227620_1
AAI/ENGG/DGM(E-C)/AGATTI/APRON
Open Tender
Civil Works
Works
720 days
Agatti Airport
As per NIT
16 documents required · 16 mandatory
₹3,540
₹48.7 L
Agatti Airport
12 Oct 2026
21 Feb 2025
26 Mar 2025
22 Feb 2025
21 Mar 2025
22 Feb 2025
22 Feb 2025 - 1 Mar 2025
27 Feb 2025
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL ITEMS ( 1 to 28 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 18,000 | SQM | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge.
2.6.1 All kinds of soil | 4,938 | CUM | - | - |
| 3 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 46 | CUM | - | - |
| 4 | Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m : | 712 | CUM | - | - |
| 5 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 14,400 | SQM | - | - |
| 6 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader/or any other mechanical mean on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge
With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20 | 4,300 | CUM | - | - |
| 7 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher /other Mechanical means in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 3,860 | CUM | - | - |
| 8 | Providing and laying of Hot Mix Semi Dense Asphaltic Concrete (SDAC) using crushed stone aggregate of quality, size and grading as specified and filler and specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camper as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [ for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 120 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material].
Filler in order of preference may be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 683 | CUM | - | - |
| 9 | Providing and laying of Hot Mix Dense Asphaltic Concrete (DAC) using crushed stone aggregate of quality, size and grading as specified and filler and specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camper as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 135 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material].
Filler in order of preference shall be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 347 | CUM | - | - |
| 10 | Providing and laying of Hot Mix Dense Bituminous Macadam (DBM) using crushed stone aggregate of quality, size and grading as specified and #filler as specified and Viscosity Grade Bitumen (packed bitumen) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in- Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade VG-30 shall be taken as 110 kg/m3 of mix supplied in drums (packed bitumen) produced by Govt. Refineries and 2% hydrated lime by weight of aggregates as filler material. Filler in order of preference shall be hydrated lime, stone dust or cement. The necessary cost adjustment shall be made based on JMF & availability of filler.
Note: The bitumen required for the work shall be supplied in Drums of capacity 150-200 kg. The rates of item including all activities as per Technical Specifications including supply of bitumen from refinery to the site at Agatti Airport. | 345 | CUM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tenderfin.pdf
Tender Documents • 5.66 MB
BOQ_255603.xls
BOQ • 0.30 MB
Tenderdocument.pdf
Tender Documents • 5.66 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .