| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.3 L+₹23,140.10 (2.56%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹9.8 L+₹73,074.30 (8.09%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | BILAL AHMED BUTT L2 | SUNIL SHARMA L1 | SATISH KUMAR JAGTA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 72.9 | P.cum | 350 ₹25,515 | 305 ₹22,234.5 Lowest | 400 ₹29,160 |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 115.2 | P.cum | 350 ₹40,320 | 348 ₹40,089.6 Lowest | 400 ₹46,080 |
| 3.00 | Stone filling behind retaining walls & B/wall :including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 14.4 | P.Cum | 2,200 ₹31,680 | 2,100 ₹30,240 Lowest | 2,500 ₹36,000 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 9.6 | P.Cum | 5,300 ₹50,880 | 5,200 ₹49,920 Lowest | 5,500 ₹52,800 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 9 | P.Cum | 6,500 ₹58,500 | 6,400 ₹57,600 Lowest | 6,800 ₹61,200 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,890 | P.Kg | 90 ₹1,70,100 Lowest | 95 ₹1,79,550 | 100 ₹1,89,000 |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 27.3 | P.Cum | 7,500 ₹2,04,750 | 7,200 ₹1,96,560 Lowest | 7,500 ₹2,04,750 |
| 8.00 | Providing and fixing M.S tiles 8mm thick sheet half round 9''dia i/c M.S sheet collar of 63/4dia i/c priming coat approximate weight 46 kg /1.80 metre length. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 45 | P.Rmt | 3,500 ₹1,57,500 | 3,400 ₹1,53,000 Lowest | 3,500 ₹1,57,500 |
| 9.00 | Providing and fixing 600 mm dia man hole cover per furated 75 mm thick including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 4 | Each | 2,400 ₹9,600 | 2,200 ₹8,800 Lowest | 2,500 ₹10,000 |
| 10.00 | 15 mm cement plaster in single coat on Rough side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 144 | P. Sqm | 380 ₹54,720 | 360 ₹51,840 Lowest | 400 ₹57,600 |
Tender Value
₹9.2 L
EMD Value
₹18,500
Closing Date
27 Aug 2025, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
C O nallah from Sunder Building to Slaughter House at Krishna Nagar ward No 13
2025_MC_112452_3
1657dated26072025
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B M C Shimla
₹18,500
25 Oct 2025
20 Aug 2025
28 Aug 2025
20 Aug 2025
27 Aug 2025
20 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .