| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC VILL SARANGPUR HABASPUR DISTRICT PURBA BARDHAMAN PIN 713401 | HABASPUR | PURBA BARDHAMAN | WEST BENGAL | 713401 | ₹20.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹20.5 L+₹47,130.93 (2.36%)Rejected-Finance VILL RAMPUR P O ARUARA DIST PURBA BARDHAMAN | ARUARA | PURBA BARDHAMAN | WEST BENGAL | ₹20.5 L+₹47,130.93 (2.36%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹20.5 L+₹47,745.68 (2.39%)Rejected-Finance GUSKARA COLLEGE ROAD P O GUSAKARA DIST PURBA BARDHAMAN | GUSKARA | PURBA BARDHAMAN | WEST BENGAL | ₹20.5 L+₹47,745.68 (2.39%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹20.5 L+₹48,155.52 (2.41%)Rejected-Finance GUSHKARA COLLEGE ROAD GUSHKARA DIST PURBA BARDHAMAN | GUSHKARA | PURBA BARDHAMAN | WEST BENGAL | ₹20.5 L+₹48,155.52 (2.41%) | L4 | Rejected-Finance 4TH LOWEST |
Tender Value
₹20.5 L
EMD Value
₹40,983
Closing Date
29 May 2026, 2:00 pmClosed
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
M/R to Protection and strengthening of Left an Right Bank of LBMC at Ch. 2662.00 for a total length of 126.00 mtr at Mouza - Bazesalpur in Block-Bardhaman-II in the District of Purba Bardhaman within Alamganj (I) Section of D.C. Head- Qtr. Sub Div
2026_IWD_1024340_6
WBIW/EE-I/DCD/e-NIT-02/2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
Bazesalpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹40,983
Yes
17 Jun 2026
15 May 2026
1 Jun 2026
15 May 2026
29 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces ).
1.20 metre x 0.60 metre nominal section. | 126 | Metre | 663.83 | ₹83,642.58 |
| 1.01 | 0.60 metre x 0.45 metre nominal section. | 126 | Metre | 355.16 | ₹44,750.16 |
| 1.02 | 0.75 metre x 0.45 metre nominal section. | 61.2 | Metre | 411.17 | ₹25,163.6 |
| 2 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge.
Mesh size 125 mm x 125 mm with 10 SWG wire. | 40.5 | Sqm. | 128.71 | ₹5,212.76 |
| 3 | Supply of Panchami stone boulders (Each weighing 25 kg & above) at site including cost of material, loading, unloading and carriage and including all incidental charges like Royalty,complete. (Royalty certificate in original from concerned authority are to be submitted along with the bill). | 459.81 | Cum. | 2,503.11 | ₹11,50,955.01 |
| 4 | Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge.
Boulder of size above 20 kg. | 459.81 | Cum. | 84.62 | ₹38,909.12 |
| 5 | Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge. a) Over Jhama Khoa / metal filter/ Geo-textile filter. | 314.41 | Cum. | 597.09 | ₹1,87,731.07 |
| 6 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 460.08 | Cum. | 129.91 | ₹59,768.99 |
| 7 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge (N.B:- Including Royalty Rs 29.00, Compentatoin for land owned/ arrange by contractor Rs 25.00 and Cess on royalty Rs 5.30) within a lead of
Beyond 1.00 km. and upto 2.00 km. | 690.12 | Cum. | 341.21 | ₹2,35,475.85 |
| 8 | Supplying, testing and installation of open Weave Jute Geo-textile (JGT) having overall weight of 500 gm/sq. m, thickness 6 mm, width 1220 mm, Tensile strength 10 KN/m (Warp direction) × 7.50 KN/m (weft direction) on slopes of embankments dressed and cut to a gradient as per design and drawing for control of surface soil erosion on proposed bank slope of embankment including the cost of preparation of subgrade and excavating the trenches of 500 mm deep and spade-width wide where necessary, and filling the trenches with earth duly secured to sub-grade by U shape MS staples (11 gauges) or wooden or plastic pegs at an interval of 450 mm, providing side lapping of 100 mm and horizontal lapping of 300 mm as per direction complete.The rate is inclusive of all incidental charges, transportation by all means to the work site, all leads and lifts complete. (Payment will made on the basis of finished surface area of the slope). | 2,061.32 | Sqm. | 69.12 | ₹1,42,478.44 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
2911i.pdf
Tender Documents • 1.26 MB
BOQ_2517431.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .