| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 LAccepted-AOC STAFF QT COLONY RAKHKOL DAMUA MADHYA PRADESH 480555 | DAMUA | CHHINDWARA | MADHYA PRADESH | 480555 | ₹2.1 L | L-1 | Accepted-AOC Successful Bidder |
| 2 | L-2₹2.1 L+₹1,265.55 (0.61%)Rejected-Finance | ₹2.1 L+₹1,265.55 (0.61%) | L-2 | Rejected-Finance Unsuccessful Bidder |
| 3 | L-3₹2.1 L+₹4,269.83 (2.06%)Rejected-Finance WARD NO 08 JUNARDEV POST JUNARDEV DISTRICT THINVADA MADHYA PRADESH | JUNARDEV | THINVADA | MADHYA PRADESH | ₹2.1 L+₹4,269.83 (2.06%) | L-3 | Rejected-Finance Unsuccessful Bidder |
| 4 | L-4₹2.1 L+₹5,769.02 (2.78%)Rejected-Finance | ₹2.1 L+₹5,769.02 (2.78%) | L-4 | Rejected-Finance Unsuccessful Bidder |
| 5 | L-5₹2.2 L+₹10,779.30 (5.19%)Rejected-Finance | ₹2.2 L+₹10,779.30 (5.19%) | L-5 | Rejected-Finance Unsuccessful Bidder |
Tender Value
₹3.3 L
EMD Value
₹4,100
Closing Date
12 Oct 2022, 11:00 amClosed
Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Repairing of collapsed boundary wall at Area Welfare Hospital under G.M. unit of Kanhan Area.
2022_WCL_257926_1
ka3450-civ-s-e042 of 2022-23
Open Tender
Civil Works - Others
Item Rate
30 days
Area Welfare Hospital
-------N.A.-------
4 documents required · 4 mandatory
₹4,100
29 Nov 2022
29 Sept 2022
13 Oct 2022
30 Sept 2022
12 Oct 2022
30 Sept 2022
30 Sept 2022 - 11 Oct 2022
Amount
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars
Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand).
Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in superstructure above plinth level up to floor one level in: Cement mortar 1:6 (1 cement : 6 coarse sand).
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade:New work (three or more coats)
Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-incharge, beyond 50 m initial lead, for all leads including all lifts involved.
Total impact of GST for the purpose of CTC
SAHEB CONSTRUCTION
PADAM JAIN
Nasiruddin
satish sharma
SIDDIQUE CONSTRUCTION
ALFAJ ALI CONTRACTOR
GUL MOHAMMAD
firoj ansari
SATPURA ONE CONSTRUCTION
RAVI SINGH VERMA CONTRACTOR
SULTAN QUADRI
vijay kumar sharma
RAJA CONSTRUCTION
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_266738.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .