Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC 01 NAUJARPUR BASAI KAJI SASNI HATHRAS UTTAR PRADESH 202150 | ALIGARH | UTTAR PRADESH | 202150 | L1 | Accepted-AOC Accept | |
| 2 | L2₹1.5 L+₹3,367 (2.24%)Rejected-Finance 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | L2 | Rejected-Finance Reject | |
| 3 | L3₹1.7 L+₹16,258 (10.8%)Rejected-Finance SANTOBI MATA GALI MURSAN HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L3 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
3 Mar 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
EDC
Work
2023_DVVNL_774737_2
EDCH-123/2022-23
Open Tender
Electrical Works
Item Rate
180 days
HATHRAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL WEBSITE
₹2,000
25 Jul 2023
24 Feb 2023
3 Mar 2023
24 Feb 2023
3 Mar 2023
24 Feb 2023
Amount
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5 Mtr. long PCC Poles.
9/11 Mtr Long STP Poles.
CT/PT combind unit /11 KV & 33 KV Metering qubical box
3*120 sqmm AB cable
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
25 KVA T/F
Dismentelling of 63 KVA T/F from Double pole with opening its all connection and carriage it up to newly errected double pole all cost of labour and T&P which requies for completion of work
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
PCC poles 8.5/9 Mtr.
9/11 Mtr Long STP Poles.
Double pole complet fitting
Fixing & Jumphering of CT/PT unit/ 11 KV & 33 KV metering qubical box
Mounting of old and used 63 KVA T/F on Newly Errected Double pole with making its all connection
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
3*120 sqmm AB cable
Errection of LT dustribution boxes & fixing of New at already/Newly errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Providing & Fixing of Following Clamps
11 KV X Arms Clamps for STP/PCC Pole
11 KV V Type X Arms Clamps for STP/PCC Pole
11 KV DP Clamps for STP/PCC Pole
11 KV F Clamp for STP/PCC Pole
Fixing of Following Accessirious
Top Channel
Dropper Channel
11 KV Pin Insulator
Cable jointing kit of Size 3*120 sqmm
LT Shackle Insulator
LT Clamp
11 KV Disc Insulator
11 KV TPMO
Danger Board
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
25 KVA T/F
Earthing of 25 KVA medium Power Transformers
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Bobby Electricals
GOSWAMI ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .