Tender Value
Refer Docs
EMD Value
₹38,000
Closing Date
10 Jun 2026, 5:00 pm4d left
EE UDAC Mathura
EE UDAC Mathura
LOT13
2026_UPIDC_1155503_13
05/EE/2026-27
Open Tender
Civil Works
90 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹38,000
Yes
4 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work. | 432.72 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge. | 42.91 | CUM | - | - |
| 3 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 1.56 | CUM | - | - |
| 4 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 131.82 | CUM | - | - |
| 5 | Struck Pointing in 1:2 Cement mortor in Brick Masonry including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 136.21 | SQM | - | - |
| 6 | Providing centering & shuttering for bridge slab, bed block, dirt wall, in Raft foundation and transitions for Reinforcement cement concrete work i/c all cost of labour & T&P etc complete for proper completion of work | 75.15 | SQM | - | - |
| 7 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 19.92 | CUM | - | - |
| 8 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 4.74 | SQM | - | - |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. | 41.88 | SQM | - | - |
| 10 | Making cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | 1.73 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
BOQ_2164879.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid