Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹64.0 Laccepted-aoc | ₹64.0 L | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
6 Mar 2026, 9:37 pmClosed
Bengaluru Water Supply And Sewerage Board
ROOPA
work of Providing and laying of 300mm dia RCC/ DWC and 230mm dia SW pipe line from 1st main to 6th main road at Poornapura, Bangalore coming under Yeshwanthpura Service station, of AEENE-1 sub division
BWSSB/2025-26/WS/WORK_INDENT3299
BWSSB/2025-26/WS/WORK_INDENT3299
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
BWSSB Executive Engineer North East
11 documents required · 7 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
WORK DONE CERTIFICATE
₹1,920
₹1.5 L
6 Mar 2026
26 Feb 2026
7 Mar 2026
5 Mar 2026
work of Providing and laying of 300mm dia RCC/ DWC and 230mm dia SW pipe line from 1st main to 6th main road at Poornapura, Bangalore coming under Yeshwanthpura Service station, of AEENE-1 sub division
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately By Mechanical Means (Bituminous course )
Dismantling of Flexible Pavements
Dismantling of Flexible pavements and disposal of dismantledmaterials and stacking serviceable and unserviceable materialsseparately II By Mechanical Means
Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retainingwalls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and ...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shor...
Earth work excavation for pipeline trenches by mechanical means as perdrawing and technical specification, including setting out, construction ofshoring, strutting, cost of blasting materials, barrica...
Providing lowering laying, jointing, testing and commissioning offollowing diameters glazed stone ware pipes, conforming to IS 651:1992,(with 5th revision) in all respects jointing with EPDM rubber ri...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED)pipes NP-3 Class conforming to IS:458-1988 with latest amentmentsusing ordinary portland cement, for sanitary works and conveyingto work site, ...
Providing and installation of Class SN8 Double Wall Corrugated HDPEpipe outer wall corrugated and inner wall smooth piping system inaccordance with IS 16098 part 2 and conveying to work site and lower...
Formwork: Formwork, centering and shuttering preferably shall be provided with
MS Sheet as required, i.e., standard specifications as per IS 1200 Part V, before lying concrete toconfine, to support or...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/we...
Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks ofapproved quality, plaster inside and out side with CM 1:3, 12mm thick,except for the conical surface outside where the plaster th...
Additional depth 1.00-1.90 mtr
Dismantling the damaged or collapsed Machinehole ,conical in shape,and reconstructing the same for the same dimensions, with machinemade wire cut brick in CM 1:4 with ordinary portland cement etc. asp...
Additional depth 1.00-1.90 mtr
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying trueto line, level and perfect linking at joints leak pr...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work:
Dismantling of existing structures like culverts, bridges, retainingwalls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherevernecess...
Providing Size Stone masonry with hard stone in foundation & plinth withCement mortar 1:6 (1 cement : 6 coarse sand)
Providing, filling and laying of sand bags filled with sand / clay for
diversion of sewage during execution of work
Dewatering the sewage / storm water by using reqired HP submersible
pump for the diversion of storm / sewage during the execution of work.
Considering for 10 Pump
LG UT cable having aluminium conductor PVC
Connecting the existing lateral connections to the proposed / existingSewer Mains, including earth work excavation in all soils, lowering,laying, barricading, dewatering, jointing RCC-NP3 Class pipes ...
By Mix in Place Method
Construction of Granular Sub-Base of required grading as perdesign spreading in uniform layers with motor grader onprepared surface mixing by mix in place method with front endl...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Construction of un-reinforced plain cement concrete pavementusing RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90
kg/m3 (75:25 proportion) as per approved mix design procedureand thickness as per des...
Prime Coat over WMM/WBM
(i) Providing and applying primer coat with SS1 grade BitumenEmulsion on prepared surface of granular base includingcleaning of road surface and spraying primer at the rate of ...
Bituminous Macadam Grading - I for traffic greater than 20 MSA
A Providing and laying Bituminous Macadam with 120 tphcapacity hot mix plant batch type using crushed aggregatesof specified grading prem...
tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsionusing emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned wi...
Providing and laying Bituminous Concrete with 120 TPHcapacity hot mix plant batch type using crushed aggregates ofspecified grading, premixed with bituminous binder VG-40 @5.2 per cent of mix and fill...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-3.doc
Tender Document • 1.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .